IRRIGATION PROFILE OF YSR KADAPA DISTRICT

INTRODUCTION

The Kadapa district was formed in 1808 during British rule with head quarters at Kadapa. There are 51 Mandals in the District. The population of the District is 28,84,524 persons as per Census 2011. The District is bounded on the North by Kurnool and Prakasam districts, on the South by Chitoor district, on the East by Nellore district and on the West by Anantapur district.

The District is rich in mineral resources. The principle minerals available are Lead, Barites, Asbestos, Lime stone, Uranium and Kadapa stone.

The District Head quarters is connected with broad gauge railway line from Mumbai to Chennai and Hyderabad to Tirupathi. The area of the district is mainly covered under major irrigation i.e., K.C. Canal, Telugu Ganga Project, GNSS Project and No. of other Medium and Minor irrigation sources.

The District is situated with in the Geographical Co-ordination of 13° 43' and 15° 14' of Northern latitude and 77° 55' and 79° 29' of the Eastern longitude. The entire District lies in Pennar river Basin. The Major amount of rain falls due to South-West Monsoon. The District is classified as drought Prone area due to Scanty and erratic rain fall. The normal rainfall is 700 mm. The climate is generally warm in Summer. The important rivers in the District are Penna, Chitravathi, Kundu, Sagileru, Papagni, Bahuda and Cheyyeru The Statistical data of the district is as follows

The classification of total area of the District is as follows:

Classification of geographical area Area (lakh acres) percent of total geographical area
Total geographical area 37.95 ---
Forest area 12.38 32.62%
Cultivable area 15.60 41.11%
Barren and uncultivable land 5.48 14.44%
Land put to Non Agricultural use 4.47 11.78%
Sown area 9.96 26.24%
Irrigated area 5.00 13.17%
Normal Average Rainfall 700 mm --
Details Of Irrigation Projects
S.No Name of Project Nos Ayacut (in acres)
A Completed Projects
I Major Irrigation Projects -- 3 Nos
a. Mylavaram Reservoir Canal System (MRC) 1 75000
b. Pulivendula Branch Canal System (PBC) 1 55580
c. K.C. Canal 1 92000
Total 3 218170
II Medium Irrigation Projects - 5 Nos
a. Annamayya Project 1 22500
b. Buggavanka Project 1 12850
c. Veligallu Project 1 24000
d. Lower Sagileru Project 1 12869
e. Upper Sagileru Project 1 5335
Total 5 77554
III Minor Irrigation
a. Pincha Project 1 3773
b. Jerrikona Project 1 4900
I&CAD. tanks (above 100 acres Ayacut) 234 66946
I&CAD. tanks (below 100 acres Ayacut) 1542 32294
Total 1778 107913
IV APSIDC 10350 10350
Grand Total 413987
B On going Projects
I Major Irrigation Projects IP to be created in the District in Acres
a. GNSS Phase-I & Phase-II 1 1,55,000
b. Telugu Ganga Project (YSR Kadapa Dt) 1 1,77,000
c. Modernization of PBC System 1 36,900 New + 55,580 (stabilization)
d. Modernization of MRC System 1 70,590 (stabilization)
e. GKLI System 1 47,500
f. Lingala Canal System 1 59,400
g. Gandikota-CBR Lift System 1 7,000
Total New - 4,82,800 Stabilization - 1,26,170
II Medium Irrigation Projects Nil Nil
III Minor Irrigation Nil Nil
IV APSIDC: 11696 11696
COMPLETED MAJOR IRRIGATION PROJECTS
1. Mylavaram Reservoir Canal System (MRC)
Preamble

Mylavaram Reservoir is constructed across Pennar River with a gross storage capacity of 9.960 TMC near Mylavaram Village in YSR Kadapa District for providing irrigation potential to an extent of 75,000 acres. The construction of the project and formation of canals were completed by the end of 1981-82 and the distributary system was completed by 1985-86. The reservoir consists of two main canals viz. MR South Canal & MR North Canal having an extent of 25,000 acres & 50,000 acres of ayacut respectively.The actual ayacut created is 70,590 Acres.

Salient Features
Name of the Project : Mylavaram Project
Name of the Reservoir : Mylavaram Reservoir (existing)
Location : Mylavaram
Latitude : 14° 0' 15''
Longitude : 78° 20' 40''
Catchment area : 19197 Sq miles
Water spread area at FRL : 41 Sq. miles
Gross Storage capacity : 9.985 TMC
Live Storage capacity : 8.97 TMC
Maximum flood discharge : 8180 Cumecs
FRL : +202.65 M
MWL : +202.65 M
TBL : +205.750
Length of earthen bund : 2484.1 M
Maximum height of earthen bund : 24 M
Length of spill way : 195.10 M
No. of gates with sizes : 13 Nos 12.20 M x 8.65 M
Ayacut under left canal and length of left canal : North canal 33.310 KM Ayacut 50,000 acres
Ayacut under right canal and length of right canal : South canal 44.44 KM Ayacut 25,000 acres
Mylavaram Reservoir Canal System (MRC) Mandal wise Ayacut
2. Pulivendula Branch Canal System
Preamble

An Anicut was constructed during year 1973 to divert water into Pulivendula Brach Canal system and PBC system is an integral part of TBP HLC system and prorate entitlement of water is 4.40 TMC at TB Dam and 2.00TMC from self catchment. The PBC system receives water from Km 72.00 of Mid Pennar south Canal and runs Km from Tumpera Deep Cut, then after it runs 10.00 Km length in Hosuramma Vanka to reach Chitravathi River and then 11.00Km in Chitravathi River to reach Anicut near Goddumarri Village of Yellanur Mandal of Ananthapur District. Due to scarcity rain fall and depending up of release of water from TBP HLC system is not fully satisfactory. Hence the Chitravathi Balancing Reservoir is constructed across Chitravathi River near Parnapalli village of LIngala Mandal of YSR Kadapa District with a storage capacity of 10.00TMC and completed the Reservoir during the 2009.

Salient features
Location :The Pulivendula Brach Canal system starts from Goddumarri Village of Yellanur Mandal of Ananthapur District to a length of 68.00Kms with various Branch Canals and Distributories to feed an ayacut of 55,580 acres.
Total Ayacut : 55,580 Acres (50,780 Acres in YSR Kadapa District and 4800 Acres in Ananthapur District.)
Mandals Benefitted : 8 Mandals (7 Mandals in YSR Kadapa District i.e., Kondapuram, Simhadripuram, Thondur, Lingala, Pulivendula, Vemula and Vempalli. 1 Mandal in Anantapuram District i..e, Yellanur)
Water allocation : The allocation of water to P.B.C.System from TBP HLC system in 4.40 TMC & 2.00 TMC from self Catchment.
Length of Canal : 68.000 Kms
Distributory Systems : 6 Nos (1. Kallur, 2. Thondur, 3. Gurijala, 4. Balapanur, 5. Ramapuram and 6. Kothapalli)
Tank Feeding : 2 Nos (1. Kamasamudram and 2. Nakkalapalli S.S. Tank) and Branch Canals to feed direct ayacut.
Budget for the Year 2015-16 : Plan 6.0000 Crs. Non-Plan 0.2190 Crs.
Chitravathi Balancing Reservoir

Salient features
River Basin : Penna
Location
Village : Parnapalli
mandal : Lingala, YSR (Dist)
Longitude : 77° 57' 37" E
Latitude : 14° 33' 37" N
Reservoir : Ananthapuramu (Dist)
Head works : in YSR (Dist)
Area under Irrigation : Stabilization of Ayacut under the PBC System Pulivendula (0.55 Lakh acres in YSR & Ananthapuramu Districts)
Head works
Total Length of concrete Dam : 301.00 M
N.O.F. on Left side : 104.25 M
N.O.F.on right side : 90.00M
Length of spill way : 106.75 M
Earth Dam : 360.00 M
RR Masonry Dam : 366.00M
Crest Level : +289.35 M
Size and No.of Gates : 12.25 M X 9.10 M & 7Nos
T.B.L. : +302.50m
MWL/FRL : +289.00M
M.D.D.L : +282.55M
Deepest bed level of river : 277.00m
Maximum Designed Flood Discharge : 4080 Cumecs (1,44,085 C/s)
Catchment Area : 5431Sq.KM
Gross Storage Capacity : 283.20 M.Cum (10TMC)
Live Storage Capacity : 281.95 M.Cum(9.956 TMC)
Storage at Crest (+289.35M) : 72.24 M.Cum (2.580 TMC)
MANDAL WISE PROPOSED AYACUT DETAILS
S.No.Name of the MandalGravityLift
1Lingala1055215924
2Pulivendula115754608
3Simhadripuram9610
4Thonduru00
5Vempalli0654
6Vemula34019891
 Total2648931077
7Yellanuru (Anantapur Dist.)18340
 Total59400
Click Here to Download Contour Capacity Tables
3. Kurnool - Kadapa Canal
Preamble

The Kurnool - Cuddapah Canal Project, a part of Tungabhadra Sub Basin of Krishna Basin is a 143 years old irrigation system in Andhra Pradesh. A private Dutch Company called Madras Irrigation Canal Co.Ltd.,had constructed this canal system during 1863-1870 for providing navigation facility as well as irrigation. The irrigation supplies required for K.C Canal System are diverted from Tungabhadra River by means of anicut constructed across this river at Sunkesula. The Tungabhadra Sub Basin is a part of Krishna Basin. As per KWDT award the allocation of assessed flows of Tungabhadra Basin and Vedavathi ( Hagari ) Sub Basin for existing and future projects in A.P. is 3929 cubic meters. Out of this the K.C Canal share is 1130 cubic meter (39.90 TMC). The project comprised of an anicut across river Tungabhadra, a tributary of river Krishna, at Sunkesula Village in Kurnool District and a 305.60 KM long navigation-cum-irrigation canal. The canal named as K.C Canal, which takes off from the right bank of the Sunkesula anicut traverses via Kurnool City and Cuddapah Town and terminates near Krishnapuram in Cuddapah District. The Designed Discharge of K.C.Canal is 3,000 C/s. The total localized ayacut under K.C Canal system is 2,65,628 Acres. There are 2 system tanks in Kurnool District and 13 system tanks in Cuddapah District under K.C Canal System.

The K.C Canal is unique in its perception and features it consists of the 4 anicuts namely

1. Sunkesula anicut across Thungabhadra River.

2. Santhajutur anicut across Galeru River.

3. Rajoli anicut across Kundu river and

4. Adnimmayapalli anicut across Penna River.

Covering two districts (Kurnool & Kadapa).

Salient features
Location : It is 130 years old Irrigation system, starting from 0/0 km of Sunkesula Anicut to Locinsula up to 234.560 km of Santha Jutur Anicut to Rajoli Anicut in Kurnool district and from km. 234.56 km to Rajoli Anicut to Adinimmayapalli Anicut upto 305.86 km of Adinimmayapalli Anicut to Tail end in Kadapa District running a total length of 306 km i.e. 234.56 km in Kurnool District and 71.30 km in Kadapa District.
Ayacut : 1) Kadapa Dist : 92000 Acres.
2) Kurnool Dist: 173622 Acres
Mandals Benefitted: : 1. Rajupalem 2. Duvvur 3. Proddatur 4. Mydukur 5. Chapadu 6. Khajipet 7. Chennur 8. Vallur 9. Chinthakommadinne 10. Kadapa 11. Kamalapuram 12. Peddamudium
Utilization: : 13.800 TMC FOR Kadapa Dist out of total utilization of 39.900 TMC under this project
Water Allocation : : 29.900 TMC FROM Thungabhadra River 10.000 TMC from Thungabhadra Dam (Due to various reasons, the river did not receive sufficient water for the past five years at Sunkesula barrage. More over, the construction vent provided in the barrage is not yet closed by the Modernization authorities by which huge water is going waste without being utilized and as such assistance from Srisailam reservoir at a rate of 1000 c/s to 2000 c/s through the pothireddypadu head regulator and Banakacherla escape channel is being taken continuously from 1-8-05 for utilization to ayacut below Santhjutur Anicut in an extent of 148577 acres
Canal Lenght: : Kadapa Dist from ch. 234.56 km to 305.86 kms = 71.30 KM.
Discharge : : 997.00 Cusecs @ 234.56km.
S.No Mandal Villages Benefitted :
1 Rajupalem Mandal Daddanala, pydala, Kullur, Gadegudur, Tangatur, Rajupalem, Tondaladinne, Erurapalem, Velavali, Korrapadu, Gopayapalli, Vellala.
2Duvvur Mandal Idamadaka, Kanagadur, Zillella, Chintakunta, jannavaram,Duvvur, Nelatur, Ballakkivaripalli, Vengannagaripalli, Machanapalli A.S.palli, Gudipadu.
3Proddatur MandalGopavaram, Proddatur, kamanur, Sarvireddipalli, Kottapalli, Upparapalli, Thallamapuram, Erraguntlapalli, Kallur.
4 Mydukur MandalSivapuram, Mydukur, Analuru
5 Chapadu MandalMadur, Pallavolu, Thummalapadu, Chepadu, Anantapuram, Bhadripalli, Alladapalli, Morrayapalli, Nerwada, Ketavaram, Pichipadu, Somapuram, Pedaguruvalur, Chinnaguruvalur, Budidapadu, Kuchupadu.
6 Khajipet MandalBhumalapalli, Tudumuladinne, Tavvaripalli, Midutur, Kommalur, K. Sunkesula, Etur, Tripuravaram, Pathur, Chemmullapalli, Chinnamukkapalli, Ravulapalli, Pullur, Dumapalagattu,K. Buddayapalli.
7 Chennur MandalDolatapuram, Bayanapalli, Kamuparthi, Sivalapalli, Kokkarayapalli, Chennur, Gurampadu, nazarbaigpalli, Dugganapalli, Rachinnayaplli, Mundlapalli, Chinnamachupalli.
8 Vallur Mandal Kotlur, Isukapalli, S.V.Puram, Gotur, Ankayapalli.
9 Chinthakommadinne MandalTRC Puram, Tadigtla, Rayapanthulapalli, Krishnapuram.
10 Kadapa Mandal Ramarajupalli, Kadapa, Akkayapalli, Chinna Chowk, Patha Kadapa, Ukkayapalli, Palempalli, Gudur, Rudrabarathipeta.
11 Kamalapuram Mandal Kamalapuram.
12 Peddamudium Mandal Suddapalli, Zangalapalli, Peddamudium, Balapanagudur, J.Kottalapalli,Uppaalur
MAJOR ONGOING PROJECTS
1. Galeru Nagari Sujala Sravanthi Project
Preamble

Rayalaseema in Andhra Pradesh is a Semi Arid Zone with scanty and erratic rainfall and has been identified as a chronically drought effected area by the Irrigation Commission (Govt. of India 1972)

Since the times of Sir Arthur Cotton proposals were formulated to provide Krishna water to Rayalaseema for drinking and irrigation to eradicate drought and famine. To arrest desertification process in this region, G.N.S.S scheme is an important step contemplated by the Govt. of Andhra Pradesh conceived in G.O.Ms.No.236, dated.22.9.1988.

The scheme envisages drawl of 38.00 TMC of surplus flood waters of River Krishna from foreshore of Srisailam Reservoir and convey them through Pothireddipadu Head Regulator, SRMC, Banakacherla Cross Regulator, SRBC, Gorakallu Reservoir, Owk Reservoir & GNSS Flood Flow Canal/Tunnel to Gandikota Reservoir. The GNSS main canal takes off from Gandikota Reservoir and runs for a length of about 344 KM feeding 10 Reservoirs enroute.

Salient features
Total Project Cost : 7467 Crores
Source : 38 TMC of surplus flood water of river Krishna to be drawn from foreshore of Srisailam reservoir in 30 flood days at the rate of 20,000 cusecs per day.
Districts benefitted : Kadapa, Chittor & Nellore districts
Contemplated IP
Kadapa District : 1, 55,000 Acres
Chittoor District : 1, 03,500 Acres
Nellore District : 15,00 Acres
Total Extent : 2, 60,000 Acres
Drinking Water Facility : 10,00,000 people in the enrooting towns and villages
Cropping Pattern : I.D crops during Rabi season Groundnut, Sunflower, Pulses,
Total length of GNSS main canal : 344.00km
No of reservoirs : 11nos

S.No Name of the Reservoir FRL(m) Gross Capacity(TMC)
1 Gandikota Reservoir +212.000 26.85
2 Vamikota Reservoir +200.000 1.60
3 Sarvaraya Reservoir +201.000 3.06
4 Single Bund Reservoir +196.000 0.638
5 Uddimadugu Reservoir +188.600 1.04
GNSS Flood Flow Canal including Gandikota Tunnel :
Preamble

About 20,000 cusecs of water will be drawn from the foreshore of Srisailam Reservoir and conveyed through the Srisailam Right Main Canal system up to Owk Reservoir. The GNSS Flood Flow Canal takes of from the foreshore of Owk Reservoir to carry water up to Gandikota Reservoir. The Flood flow canal is divided in to 3 Packages in addition to the Tunnel at the end. The Government have accorded Revised Administrative approval for Rs 1080.00 Crores for excavation of GNSS Flood Flow Canal including Tunnel. The Agreement value of these Packages is Rs 687.68 Crores. The expenditure incurred so far is Rs 646.35 Crores. The % of work completed is 94%. The works are programmed to be completed by 31-10-2015

The entire land required for the completion of the above works is already acquired and there is no balance land to be acquired

2) GNSS Phase -- I :
PACKAGE No: 1 (GANDIKOTA DAM):
Preamble

Gandikota Dam is constructed across Penna river near Gandikota village in Kadapa District to store 26.85 TMC of flood water conveyed from the fore shore of Srisailam Reservoir through Pothireddypadu Head Regulator. The work of construction of Gandikota Dam is completed in all aspects and ready to receive water.

Salient Features of Gandikota Reservoir
Name of the Project :G.N.S.S Project
Name of the Reservoir: Gandikota Reservoir (under construction)
Location: Gundluru (V) in Kondapuram (M)
Latitude : 14° 48' 25" E
Longitude : 78° 15' 14" N
Catchment area: 19197 Sq. Km
Water spread area at FRL: 109.35 Sq.Km
Gross Storage capacity: 26.85 TMC
Live Storage capacity: 22.300 TMC
Maximum flood discharge : 8180 Cumecs
FRL: +212.000 M
MWL : +212.000 M
TBL: +215.000 M
Length of earthen bund: --
Maximum height of earthen bund: --
Length of spill way: 320 M
No. of gates with sizes: 14 Nos 15 M x 9.80 M
PACKAGE No: 2 (Vamikonda Sagar & Sarvaraja Sagar):
Vamikonda Sagar:
Sarvaraja Sagar:
Preamble

The work is formation of Vamikonda Sagar (1.2 TMC) and Sarvaraja Sagar (3.6 TMC) Reservoir and excavation of GNSS Main Canal from KM.24.330 to KM. 32.640 i.e., 8.31 KMs length of canal.

Ayacut contemplated under this Package is 35,000 Acres

Salient Features of Vamikonda Sagar & Sarvaraja Sagar Reservoirs
Name of the Project: G.N.S.S Project G.N.S.S Project
Name of the Reservoir: Vamikonda Sagar Reservoir (under construction) Sarvaraja Sagar Reservoir (underconstruction)
Location: Latitude: 14° 35' 45" Longitude: 78° 26' 30" Latitude : 14° 31' 30" Longitude : 78° 27'
Catchment area: 15.56 Sq.km 15.62 sq.km
Water spread area at FRL: 8.67 sq.km 10.57
Gross Storage capacity: 1.600 TMC 3.060 TMC
Live Storage capacity: 1.333 TMC 2.760 TMC
Maximum flood discharge: 150 cumecs 143 cumecs
FRL: +200.00 M +201.300 M
MWL: +200.900 M +202.200 M
TBL: +203.00 M +204.300 M
Length of earthen bund: 9100 5440
Maximum height of earthen bund: 17.44 26 M
Length of spill way: -- --
No. of gates with sizes -- --
Any other details HC weir with a discharge of 150 cumecs HC weir with a discharge of 143 cumecs
Ayacut 10,000 Acres 25,000 acres
GNSS Phase-II:
Preamble

The Government have accorded administrative approval for GNSS Phase - II works for providing irrigation facilities to 2.25 Lakhs Acres i.e., 1,20,000 Acres in Kadapa District, 1,03,500 Acres in Chittoor & 1500Acres in Nellore District vide G.O.Ms.No.50 I&CAD(Maj.Irr.VI) Dept., Dt.25.2.2008 for Rs.2525.91Crores. The GNSS Phase-II works are divided in to 14 Packages, out of which 1 to 7 Packages fall in Kadapa District and 8 to 14 Packages fall in Chittoor District.

This Chief Engineer(Projects) & District Water Resources Officer, Water Resources Department, Kadapa is incharge of 1 to 7 Packages. Tenders were finalized and Agreements were concluded for 7 Packages in Kadapa District and the works are in Progress.

The GNSS Phase-II Main Canal enrouting the Reservoirs runs for a length of 240 KM. in Kadapa District and it travels through reserve forest in patches. After conducting detailed investigation it is identified that an extent of 4000 acres of forest land is getting affected under GNSS Project Phase-II in Kadapa District. Non forest land of 1425 acres of afforestation land is identified by the District Collector, Kadapa. The remaining afforestation land is under process.

The main components of GNSS Phase-II Kadapa District works is as follows.

1) Excavation of main Canal from Km 32.640 to 240.00 Km including CM & CD works.

2) Formation of Uddimadugu Reservoir.

The main components of GNSS Phase-II Chittoor District works is as follows.

1) Excavation of main Canal from Km 240.00 to 334.00 Km including CM & CD works.

2) Excavation and lining of Balaji Tunnel 1 and 2.

3) Excavation of Kailasagiri Canal from Km 00.00 to 65.50 Km and distributory system of 55,000 acres in             Chittoor and Nellore Districts.

4) Formation of Mallimadugu Reservoir

5) Formation of Balaji Reservoir.

6) Formation of Padmasagar Reservoir.

7) Formation of Srinivasa Sagar Reservoir.

8) Formation of Venugopala Sagar Reservoir.

9) Formation of Vepagunta Sagar Reservoir.

10) Formation of Adavikottur Sagra Reservoir.

The GNSS Phase-II Main Canal from Km 240.00 to 334.00 km enrouting the Reservoirs runs in Chittoor District and it travels through reserve forest in patches. After conducting detailed investigation it is identified that an extent of 3836 acres of forest land is getting affected under GNSS Project Phase-II in Chittoor District. Non forest land is to be identified by the District Collector, Chittoor .

GNSS PROJECT ( Phase - II) intends to provide irrigation facilities to an extent of 2.25 Lakhs Acres i.e., 1,20,000 Acres in Kadapa District, 1,03,500 Acres in Chittoor & 1500Acres in Nellore District. The GNSS Phase-II works are divided in to 14 Packages, out of which 1 to 7 Packages fall in Kadapa District and 8 to 14 Packages fall in Chittoor District.The GNSS Main Canal under Phase-II runs for a length of 206 KM. in Kadapa District.

Salient Features of Single Bund Reservoir
Name of the Project : G.N.S.S Phase-II
Name of the Reservoir : Single Bund Reservoir (under construction
Location : Gurramgumpu thanda Latitude 14° 23' 23" Longitude 78° 4' 17"
Catchment area : 15.54 Sq.km
Water spread area at FRL : 208.88Ha
Gross Storage capacity : 0.638TMC
Live Storage capacity : 0.638 TMC
Maximum flood discharge : 130cumecs
FRL : +196.000 M
MWL : +196.690 M
TBL : +199.000 M
Length of earthen bund : 2.45km
Maximum height of earthern bund : 25.30m
Length of spill way : 125 m
No. of gates with sizes :
Any other details : HC weir with a discharge of 157 cumecs
Budget for the Year 2015-16 : Plan 169.58 Crs.
2. Telugu Ganga Project
Preamble

The T.G.P. now under construction is a diversion scheme from foreshore of N.S.R. Sagar project and is intended to supply 15 TMC of Krishna water to Chennai city for drinking purpose besides creating irrigation Potential of 5,75,000 acres (1.08 Lakhs acres in Kurnool Dist., 1.77 Lakhs acres in Kadapa District utilizing 29 TMC of Krishna Water through Velugodu Balancing Reservoir and S.P.V.B. Reservoir respectively and 0.46 Lakhs acres in Chittoor District and 2.54 Lakh Acres in Nellore District utilizing 30 TMCC of Pennar water through Kandaleru Reservoir). The Telugu Ganga Project Main canal from Km.98.260 to S.P.V.B. Reservoir intended to impound Subsidiary Reservoir-I, Subsidiary Reservoir-II and S.P.V.B. Reservoir and the canal from Subsidiary Reservoir-I to Pennar river intended to drinking water supply to Chennai is situated in the Kadapa District.

The S.P.V.B. Reservoir with a storage capacity of 17 TMC is located near B.Mattam village in B.Mattam Mandal of Kadapa District and is envisaged to irrigate a total ayacut of 1,50,000 Acres in the Kadapa District and it is envisaged to generate 15 MW of Power at Subsidiary Reservoir-I while letting water into Chennamukkapalli canal which is intended to supply drinking water to Chennai city, besides irrigating an ayacut of 17,000 Acres under SR-I and another 10,000 Acres under SR-II in Duvvur, Mydukur and Khajipet Mandals.

The estimated cost of the total project is Rs.637 Crores (S.S.R. of 1983-84 year) and the revised cost is Rs.2735 Crores (SSR of 1997-98 year) as per the Project report 1998 and Rs. 4432 Crores (SSR 2006-07) as per the project report, 2006. The cost of the project works in the District as per project report 2006 is Rs.683.85 Crores. The amount spent upto 2004 is Rs. 304 Crores and and Rs. 382 Crores from 2004 onwards on the works in Kadapa District and an Irrigation Potential of 126800 acres has been created. Further, Lining to the Canals has been taken up with cost of Rs. 229.29 Crores and an amount of Rs. 214.92 Crores has been spent so far. The project is programmed to be completed by 2015-16.

The total land to be acquired is 5573 acres and so far 5471 acres is already acquired and the balance is programmed to be acquired June, 2015. An amount of Rs.65.00 Crores is require for completion of balance works

Scope:

Telugu Ganga Project is an inter-state project formulated to Irrigate 5.75 Lakh acres in drought prone areas of Rayalaseema and up lands of Nellore District besides conveying 15 TMC of Krishna waters to Chennai city. The cost of the Project as per original project Report was Rs.637 Crores. The cost as per the Review Report with 1997-98 SSRs is Rs.2735 Crores and cost as per latest review report 2006 is Rs 4432 Crores. The project is cleared from Environmental and Forest angle.

Hydrology:

The flood flows of river Krishna are proposed tobe diverted to S.P.V.B. Reservoir (17 TMC capacity) for Irrigation in Sagileru basin. Two subsidiary reservoirs viz., S.R-I (2.133 TMC) and S.R-II (2.444 TMC) are also proposed on T.G.P. Main canal. The self catchment of these reservoirs is very little and negligible. Water will be received from N.S.R. Project and stored in the reservoirs.

Sailent Features Of Reservoirs In Ntr Telugu Ganga Project, Kadapa
S.No Details SR-I SR-II SPVBR
1 Name of the Village & Mandal Near Challabasayapalli (v) of Duvvur Mandal Near Ganjikunta (v) of Duvvur Mandal Kandimallayapalli (v) of B.Mattam Mandal
2 Location Latitude - 14° 50' 50'' Longitude - 78° 43' 40'' Latitude - 14° 47' 25'' Longitude - 78° 47' 55'' Latitude - 14° 48' 0'' Longitude - 78° 53' 0''
3 Catchment Area 34.56 Sq.Km 91.21 Sq.Km 56.17 Sq.km
4 Water Spread Area at F.R.L 5.18005 M.sqm 5.5351 M.sqm 27.34 M.sqm
5 Gross Storage Capacity 2.133 TMC 2.444 TMC 17.735 TMC
6 Live Storage Capacity 1.844 TMC 2.271 TMC 17.00 TMC
7 Maximum Flood Discharge 12360 cusecs 16420 cusecs 15000 cusecs
8 FRL 223.00m 222.780m 216.500 M
9 MWL 224.000 M 224.000 M 217.500 M
10 TBL 226.000m 226.000m 220.500 M
11 Sill Level 208.00 m 204.00 m Left : 192.50 M/ Right : 186.00 M
12 Length of the Earthen Bund Bund-A : 680 m Bund-B : 1140 m Bund - C :950 m Bund - D : 1100 m length of Earth dam (in M) 1. Main dam - 2475 2. Gorge No.1 - 330 3. Lower gorge - 554 4. Saddle dam - 2750
13 Maximum Height of Earth Bund Bund - A : 17 m Bund - B : 28 m Bund - C : 30m Bund - D : 35m Height of Earth dam (in M) 1. Main dam - 50.50 2. Gorge No. - 31.50 3. Lower gorge - 48.50 4. Saddle dam - 11.50
14 Length of the spill way 185.00m Spillway provided on Link canal to SR-II 110.00m on right flank of bund - D Spill way on left flank is proposed but designs are under progress
15 No of Gates with sizes Ungated spill way Ungated spill way Spill way designs are under progress
16 Contemplated Aayacut 17,000 ACRES 10,000 ACRES 1,50,000 ACRES
17 Budget for the Year 2015-16 Plan - 42.62 Crs.
Stage of works:

1. T.G.P. Main canal from Km.98.260 to S.R-I: The entire canal in the stretch is excavated and lined.

2. Subsidiary Reservoir-I: Subsidiary Reservoir-I comprises Bund A&B. The works of Bunds are completed including construction of Head Regulator.

3. Link Canal between S.R-I & S.R.-II: The length of Link Canal between S.R-I & S.R-II is 2.452 Km and canal is completed.

4. Subsidiary Reservoir-II: Subsidiary Reservoir-II comprises Bunds-C & D. The work is completed.

5. T.G.P.Main canal from S.R-II to S.P.V.B. Reservoir: The canal is completed.

6. Formation of S.P.V.B. Reservoir: The Reservoir is completed except providing gates for spillway and Protection works in Lower gorge portion. The protection works to lower gorge portion are now taken up and programmed to be completed by August, 2016.

7. Chennamukkapalli canal from S.R-I is completed.

8. Irrigation canals under under S.R-I: The irrigation canal is completed.

9. Irrigation canals under S.P.V.B. Reservois: The excavation of Canals is completed and lining is nearing Completion.

Financial outlay:

The amount spent is Rs. 304 Crores upto 2004 and Rs. 382 Crores on excavation of Canals and Rs. 214.92 Crores from 2004 onwards on the works in Kadapa District. An amount of Rs.136.00 Crores is proposed in the budget for the year 2015-16.

The contemplated ayacut is 177000 Acres, the ayacut identified is 1,58,000 Acres and Irrigation potential created so far is 1,26,800 Acres. The creation of balance Irrigation potential of 32,000 Acres is programmed to be completed by 12/2015.

Statement showing Constituency wise and Mandal wise aycut
Name of the Assembly Constituency Name of the Mandal Ayacut Contemplated Acres Ayacut identified in Acres IP Created Acres
Mydukur Duvvur 6901 16115 10033
Mydukur 18,987 18823 13680
Khajipet 1112 680 500
Chapadu 0 763 0
B.Mattam 25,595 26396 24548
Badvel B.Kodur 14457 16709 16709
S.A.K.N 25651 21265 20704
Kalasapadu 9787 6542 4200
Porumamilla 14458 14796 10688
Badvel 30495 13490 10405
Gopavaram 24218 10610 10274
Atlur 5339 11786 5059
Total 177000 157975 126840
Statement Showing year wise ayacut Irrigated
S.No Year Rabi Total
SR-I-CMP Canal SR-II-Irriagtion Canal SPVBR Right canal SPVBR left Canal upto PML SPVBR left Canal Beyond PML
1 2004-05 -- -- --
2 2005-06 5000 -- -- 5000
3 2006-07 6720 -- 8600 -- 15320
4 2007-08 7000 8333 1270 -- 16603
5 2008-09 8450 8333 9218 -- 26001
6 2009-10 8450 3646 8333 10568 -- 30997
7 2010-11 2000 8333 8740 -- 19073
8 2011-12 5000 6029 8333 18610 -- 37972
9 2012-13 8450 4000 8333 20000 -- 40783
10 2013-14 2000 2500 8333 15458 1000 29291
11 2014-15 12000 8000 1000 21000
3. PBC Modernization

Pulivendula Branch Canal receives water from South Canal of Mid Pennar Dam through Thumpera deep cut. The canal takes off from pickup anicut constructed across Chitravathi River near Goddumarri Village with carrying capacity of 580 Cusecs. 4.40 TMC of water is allocated to PBC on prorate basis from TBP HLC System.

The existing ayacut under the system is 55,580 acres covered in 8 Mandals.

In order to restore the designed capacity of canal and obtain maximum benefits from the scheme so as to supply water to tail end ayacut, in addition to creation of new ayacut to an extent of 36,900 acres through lift schemes, the existing canals are proposed for modernization with an estimated cost of Rs.245 Crores. The Works are taken up under 5 Packages viz; Packages 92, 93, 93(B), 92(A), & 93(A).

4. Modernization of Mylavaram

The Mylavaram Reservoir which is a part and parcel of TBP HLC system with gross storage capacity of 9.96 TMC, provide irrigation facilities to an extent of 75,000 acres (under Rabi I.D) spread over in 9 mandals viz; Mylavaram, Peddamudium, Jammalamadugu, Rajupalem, Proddatur, Yerraguntla and Kamalapuram Mandals of YSR District and Sanjamula and Chaglmarri Mandals of Kurnool district. In order to ensure equitable and uniform water distribution to the total command area, modernization of main canals and distributory system has been taken up with an estimated cost of Rs.151.00 Crores. The Works are taken up under 2 Packages viz; Packages 90, 91.

Budget for the Year 2015-16 : Plan - 6.0000 Crs. Non Plan - 1.5650 Crs.
Cumulative Expenditure upto 5/2015 : 153.3700 Crs
5. Gandikota Lift Irrigation (GKLI) Scheme
Preamble

GKLI Scheme is proposed to lift 6.00TMC of water from foreshore of Gandikota Reservoir through 2 stages of lifts

1) From Gandikota Reservoir to Paidipalem Reservoir.

2) From Himakuntla sump to PBC with a feeder channel from Paidipalem Reservoir to Himakuntla sump to irrigate gap ayacut of 41,000 acres under PBC and direct ayacut of 47,500 acres in 6 mandals.

Salient Features of Gandikota Lift Irrigation Scheme
GKLI Stage-I
Pump Details(Stage-I)
V.T. Pumps (KBL Make) : 10 No. [9 +1]
Static lift head: 77.00 M [+204 to +281]
Total Lift Head: 88.30 M
Water to be lifted: 6.00 TMC
Number of pumping days: 67 days
Capacity of each Pump: 5030 HP
Discharge of each pump: 3.237 Cumecs[114 C/S]
Total discharge of 9 Pumps: 29.14 Cumecs[1029 C/S]
Motor Details(Stage-I)
Type of Motor: 3Phase Squirrel Cage Induction Motor
Manufacturer: WEG, Brazil
Total Motors: 10 No. [9 +1]
Motor level: +217.200
Capacity of Each Motor: 3700 KW/ 5030 HP
Speed : 596 RPM
Total power demand: 39.5 M.W
Any other details: HC weir with a discharge of 163 cumecs
Pressure Mains(Stage-I)
M.S. Pipes diameter : 3000 mm X 2 rows
Total Length : 10.100 KM
Total discharge : 29.14 Cumecs [1029 Cusecs]
Total head (+204 to +281) : 77.00 M
Paidipalem Balancing Reservoir
Latitude : 14° 46' 38'' N
Longitude : 78° 10' 29'' E
Self Catchment : 20 Sq. KM
TBL : +285.000M
MWL : +281.600M
FRL : +281.000M
MDDL : +243.500M
Length of the Bund : 3.668 KM
Side slopes (U/s & D/s) : 2.5:1
Capacity : 6.00 TMC
Top width : 6.00 M
Max. Height : 42.52 M
Max. Base width : 200 M
No. of Sluices : 3 (Three)
a) Head Sluice @ km 1.286
Sill level : +245.000
Vent Size : 2 x 2.00 x 2.00 M
Discharge : 10.10 Cumecs [356 c/s]
Ayacut : 39402 Ac
b) Mallela Canal Sluice @ Km (-) 0.092
Sill level : +266.600
Vent Size : 1x 2.10x1.50 M
Discharge : 3.60 Cumecs [126 c/s]
Ayacut : 7869 Ac.
c) Lavanur Sluice @ Km. 3.400
Sill level : +243.500M
Vent Size : 1x 1.50x1.00 M
Discharge : 0.43 Cumecs [15 c/s]
Ayacut : 2735 Ac.
Feeder Channel
Length of the canal : 16.600 KM
Design discharge : 10.10 Cumecs [356 c/s]
Bed Level : Start +245.000 ~ end +243.110M
Bed width : 6.50 M
F.S.D. : 1.70 M
Free Board : 0.60 M
No. of CM & CD works : 32
Himakuntla Sump
TBL : +247.750M
MWL : +245.660M
FRL : +244.750M
MDDL : + 241.500M
Top width : 6.00 M
Capacity : 0.040 TMC
Length of the Bund : 0.700 Km
GKLI Stage-II
Approach Channel
Length of Approach channel : 1050 Mtrs.
Discharge : 10.00 Cumecs
Bed width : 7.35 Mtrs.
Bed level : +239.000
Side slopes : 1.5:1
Minimum water level for pumping : +240.465
Pump Details (Stage-II)
V.T. Pumps (KBL Make) : 4 No. [3 +1]
Static lift head : 14.50 M [+241.5 to +256]
Total Lift Head : 19.00 M
Water to be lifted : 2.86 TMC
Number of pumping days : 90 days
Capacity of each pump : 965 HP
Discharge of each pump : 3.00 Cumecs[106 C/S]
Total discharge of 3 Pumps : 9.00 Cumecs[318 C/S]
Motor Details(Stage-II)
Type of Motor : 3Phase Squirrel Cage Induction Motor
Manufacturer : WEG, Brazil
Total Motors : 4 No. [3 +1]
Motor level : +248.150
Capacity of Each Motor : 710 KW/ 965 HP
Speed : 595 RPM
Total power demand : 3.5 MW
Pressure Mains Stage-II
M.S. Pipes diameter : 1500 mm
No. of rows : 3
Total Length : 1.525 KM
Thickness of Pipe : 8 mm
Total discharge : 9.00 Cumecs [318 c/s]
Total head(+241.50 to +256.00) : 14.5 M
Delivery Cistern in P.B.C.
Delivery Level : +256.000
Box Size : 15.00 x 10.00 M
FSL of PBC Canal : +254.665 M
Bed Level of PBC Canal : +253.000 M
Bed width of PBC Canal : 10.00 M
Distributory Network : 47,500 Acres
Santhakovur Distributory(takes off from km 3.250 L/S of feeder channel)
Bed width : 7.65 M
Full Supply Depth : 1.25 M
Free Board : 0.50 M
Discharge (Designed) : 8.251 Cumecs [291 c/s]
Total Length of canal : 33.410 Km
Ayacut identified : 34,088 Acres
Total Majors : 10
Total Minors & sub minors : 24
No. of CM & CD Works : 105
Lavanur (Y. Kothapalli) Major (takes off from km 3.250 R/S of feeder channel)
Starting Point : Km.3.250 R/S of Feeder Channel
Bed width : 2.55 M
Full Supply Depth : 0.70 M
Free Board : 0.45 M
Discharge (Designed) : 1.174 Cumecs [41c/s]
Total Length of canal : 9.200 Km
Ayacut identified : 5,314 Acres
Total sub minors under Minors : 6
No. of CM & CD works : 32
Mallela Supply Canal (takes off from Sluice @ km (-) 0.070 of Paidipalem Reservoir)
Bed width : 3.50 M
Full Supply Depth : 1.20 M
Free Board : 0.90 M
Discharge (Designed) : 3.560 Cumecs [126 c/s]
Total Length of canal : 22.000 Km
Ayacut identified : 7,869Acres
Total Majors : 2
Total Minors & sub minors : 11
No. of CM & CD works : 78
Lavanur Sluice Canal (takes off from Sluice @ km 3.370 of Paidipalem Reservoir)
Bed width : 1.78 M
Full Supply Depth : 0.56 M
Free Board : 0.45 M
Discharge (Designed) : 0.610 Cumecs [21 c/s]
Total Length of canal : 5.625 Km
Ayacut identified : 2,731 Acres
Total Minors & sub minors : 5
Mandal wise Ayacut under G.K.L.I. Scheme
S.No Mandal Ayacut
1 Kondapuram Mandal (Jammalamadugu) 13300 Acres
2 Simhadripuram Mandal(Pulivendula) 11500 Acres
3 Thonduru Mandal(Pulivendula) 22700 Acres
Total Ayacut 47500 Acres
Click Here to Download Area Capacity Table of Paidipalem Balancing Reservoir
6. CBR Right Canal
Preamble

The scheme utilizes 4.0 TMC of water from Chitravathi Balancing Reservoir to feed an ayacut of 59,400 acres in 6 Mandals viz. Lingala, Simhadripuram, Pulivenduala, Vemula, Vempalli in Kadapa District and Yellanur in Ananthapur District. Total cost of the scheme Rs.336.20Crores.

Salient Features
Ayacut under Phase I : 25,000 Acres
Ayacut under Phase II : 34,400 Acres
Total Ayacut : 59,400 Acres
Number of Villages to be Benefited : 28
Discharge
Km 0.00 to Km 14.98 : 39.932 Cumecs
Km14.98 to km 56.00 : 10.20 / 1.30 Cumecs
Link Canal to feed PBC : 29.732 Cumecs

Components of the Project

1. Construction of Head Regulator and Cross Regulator

2. Excavation of canal From 0.00 km to 56.025 km & Link canal For 2.125 km.

3. Lining of canal from 0.00 km to 56.025 km & link canal 2.125 km.

4. CM & CD works on the main canal and link canal.

5. Distributories System from Main Canal and CM & CD works.

6. Lift schemes -22nos.

7. Improvements and formation of new Tanks -17nos.

8. Cisterns - 4nos.

9. Construction of Pump Houses -22nos.

7. Gandikota CBR Lift Irrigation Scheme
Preamble

The Government have approved for contemplation of new scheme Gandikota CBR Lift Scheme to bring more area under cultivation with introduction of Micro irrigation and stabilization of existing ayacut in Kadapa and Anantapur Districts. Accordingly, the Govt. had accorded administrative approval vide G.O.Ms.No 227 and 228 dated: 23.12.2006 for Rs.1744 Crores for providing irrigation facilities to an extent of 12,000 acres by lifting 8.30 TMC of water from Gandikota Reservoir to Chitravathi Balancing Reservoir besides stabilization of Ayacut under CBR, Lingala canal system, PBC etc., in Kadapa and Anantapur Districts. Government have accorded Administration approval for taking up PMS vide G.O.Ms.No.227, Dt.23.12.2006 for irrigating an ayacut of 1,06,000Acres and G.O.Ms.No.228, Dt.23.12.2006 for irrigating an ayacut of 20,000Acres (subsequently enhanced to 20,750Acres during formulation) by lifting 8.30TMC of water from Gandikota Reservoir to CBR in 5No. of lifts. The works are proposed in 6 Packages. Namely LI 01 to LI 06. The Package works of LI-01 to irrigate an ayacut of 3,500Acres under Micro Irrigation are awarded to IVRCL KBL (JV) with the Agreement value of Rs.275.00 Crores. The details of the scheme consisting of 5 stages and progress achieved so far after concluding agreements is as follows.

The details of the scheme consisting of 5 stages and progress achieved so far after concluding agreements is as follows.

1) Stage I (LI-01):

Lifting of 8.30 TMC Water from + 204.000 to +221.000 from foreshore of Gandikota Reservoir near Thimmapuram.

Formation of Storage Reservoir - I with a capacity of 0.30 TMC near Thimmapuram of Kondapuram Mandal.

Creation of Irrigation potential to an extent of 3,500 acres in Kondapuram Mandal of Kadapa District.

Length of Pipe line is four rows of 5.35 kms.

2) Stage II (LI-02):

Lifting of 8.10 TMC Water from + 219.000 to +236.000 from foreshore of Storage Reservoir - I to Storage Reservoir-II near Yellanur

Formation of Storage Reservoir - II with a capacity of 0.31 TMC near Yellanur of Yellanur Mandal in Anantapur District.

Creation of Irrigation potential to an extent of 5,000 acres in Yellanur Mandal of Anantapur District

Length of pipe line is four rows of 11.8 kms

3) Stage III (LI-03):1

Lifting of 7.80 TMC Water from + 234.000 to +250.000 from foreshore of Storage Reservoir - II near Yellanur to Storage Reservoir-III near Gaddamvaripalli.

Formation of Storage Reservoir - III with a capacity of 0.30 TMC near Gaddamvaripalli of Yellanur Mandal.

Creation of Irrigation potential to an extent of 3,500 acres in Yellanur Mandal of Anantapur District.

Length of pipe line is four rows of 5.0 kms

4) Stage IV (LI-04):

Lifting of 7.50 TMC Water from + 248.000 to +260.000 from foreshore of Storage Reservoir-III near Gaddamvaripalli to Goddumarri Anicut.

Improvements to Goddumarri Anicut to a capacity of 0.07 TMC for stabilization of ayacut under PBC.

Length of pipe line is four rows of 6.025 kms

5) Stage - V (LI-05):

Lifting of 7.50 TMC Water from + 258.000 to +298.000 from foreshore of Goddumarri Anicut to Chitravathi Balancing Reservoir.

Stabilization of existing ayacut under PBC.

Creation of Irrigation potential in the mandals of Simhadripuram, Thondur, Lingala and Pulivendula under various proposed new ongoing Irrigation Schemes

Length of pressure Main is four rows of 5.940 km.

6). Stage VI (LI-06):

Lifting of 0.60 TMC Water from foreshore of Gandikota Reservoir to the Left Bank of River Chitravathi.

Creation of Irrigation potential to an extent of about 8750 acres in Talla Proddutur and other Mandals of Anantapur District.

Length of pipeline stage1-13kms&dia 1.7m, stage-2-11kms&dia1.10, stage3-3.6kms & dia0.5.

COMPLETED MEDIUM IRRIGATION PROJECTS
1. Annamayya (Cheyyeru) Project
Preamble

The Annamayya (Cheyyeru) Project is a Medium Irrigation project constructed across Cheyyeru River, which is a tributary to Pennar River near Badanagadda (V) in Rajampet Mandal of Kadapa District. The location of the Project is about 25km from Rajampet.

Annamayya project provides irrigation facility to an extent of 9105 ha ( 22500acres ) i.e., 5261 ha, Khariff ID 2630 ha, Rabi ID and 1214 ha stabilization of wet ayacut under tanks in 18 Villages in Rajampet and Pullampet Mandals of Kadapa District.

The ultimate I.P. contemplated in project report is as follows.

Kharif : 13,000 Acres (I.D.)
Rabi : 6,500 Acres (I.D.)
Under Tanks : 3,000 Acres (Wet)
Total : 22,500 Acres

The District Collector, Y.S.R. District, Kadapa had issued order for Localized ayacut under Annamayya Project to an extent of 10236.33 Acres for Rabi season in twelve villages of Rajampet and Pullampet Mandals vide Ref No. D3/2832/2011 dt. 28.12.2011.

Now the ayacut is localised for the year 2012-13 as follows vide above order and six tanks ayacut under control of regular division, Kadapa, the water required for these tanks to be filled by this canal.

Kharif : Nil
Rabi : 10236.33 Acres (I.D)
Under Tanks : 1526 Acres (Wet)
Total : 11762.33 Acres
Salient Features
Location
Name of the Project : Annamayya (Cheyyeru)
Longitude : 79° 1' 15"
Latitude : 14° 12' 06"
Village : Badanagadda
Mandal : Rajampet
District : Cuddapah
State : Andhra Pradesh
Hydrology
Free catchment area : 988.6 sqkm
Intercepted catchment area : Not considered
Drainage area of the existing tank : 216.7 sqkm
Influencing rain gauge stations : Punganur, Rajampet,Vayalapad,Pullampet, Lakkireddipalli,Rayachoty, Pileru
Mean annual rainfall : 773.5 mm
75% dependable yield : 77.8 Mcum
Yield from tanks deducting evaporation losses : 11.22 Mcum
a) Maximum flood discharge (100 year frequency) : 6.795 cumec.
b) Maximum flood discharge : 8.069 cumec
Yield allotted for the scheme for Utilization : 67.3 Mcum 2.3967 TMC(or)2.24 TMC
Reservoir
Deepest bed level of river : 181.65 m
Sill level f sluice : 195.06 m
FRL : 203.60 m
MWL : 203.60 m
TBL : 206.65 m
Dead storage : 18.58 Mcum
Live storage : 44.58 Mcum
Gross storage at FRL : 63.16 Mcum
Percentage of dead storage : 29.42%
Silt capacity below sill of sluice (for 75 years) : 16.82 Mcum
Silt capacity in live storage After 75 years : 9.65 Mcum
Total provision : 26.18 Mcum
Net live capacity after 75 yrs : 35.22 Mcum
Lift of reservoir : 75 years
Area of submergence at FRL : 760 ha.
Evaporation losses in reservoir : 11.46 Mcum
Dam
Type of Dam : Earth Dam
Total length including spillway : 430 m
Length of earth dam : 336 m
Maximum height : 25.50 m
Top width : 6m
Upstream slope : 2.5 : 1
Downstream slopes from 206.5 to 200.65 : 2.5 : 1
From bottom to 200.65 : 2.5 : 1
Surplussing Arrangements
Length of spillway : 94.00 m
Type of spillway and gates : Ogee spillway with radial gates
Profile : W.E.S. Profile
Crest level : 189.60 m
Length between abutments Of spillway : 82.75 m
No. & Size of radial gates : 5 Nos. of size 13.75x14m
Discharging capacity of spillway : 8,069 cumec
Canal
Length of main canal : 23.63 km
Bed level of canal at head : 195.06 m
Full supply Depth : 1.5 m in flume sections and 1.2 m in normal section.
Section of canal (flume sec) : 2.5 x 1.5 m
Section of canal (Normal sec) : 5.5 x 1.2 m
Capacity : 10236 acres
I.P. Created : 10236 acres
I.P. Utilized during 2011-12 : Nil
Khariff : Nil
Rabi : Nil
Components of Project : Earth dam, Spillway, Radial gates
Mandals Benefited : Rajampet, Pullampet
Water utilization : Nil
Cropping pattern : Groundnut, Sajja
Budget for the Year 2015-16 : Plan - 1.3500 Crs.
2. Bugga Vanka Project
Preamble

The Buggavanka Project is a medium irrigation project was constructed across the buggavanka vagu,which is a tributary of Penna river and located at about 10 KM South of kadapa and 3 KM from Ippapenta village in chinthakomma Dinne Mandal of kadapa District. The project was started during the year 1986 and completed during the year 2000. The capacity of the project is 0.506 TMC. The project comprising of earth bund, spillway, with 4 Nos., (12m x 6m) radial gates, N.O.F and Right side, Left side sluices.

The Buggavanka project original administrative sanctioned is accorded by the government vide G.O Ms. No.273,Dated:26.07.1985 for rupees 320.00 Lakhs. The revised administrative sanction is accorded by the government vide G.O Ms.No.330,Date:23.12.1996 for rupees 3809.17 Lakhs. Simultaneously the government administrative sanction for rupees 466.00 lakhs vide G.O Ms.No.156,Dated:24.09.2009,for rupees 210.60 Lakhs Vide G.O Ms.No.62,Dated:30.04.2008 for remedial measures of Buggavanka Project.

An Irrigation potential of 9700 Acres in Khariff and 3150 Acres in Rabi has been created under this project in chinnthakomma Dinne Mandal in Kadapa District. This project has two main canals-one is left side head sluice at Ch.390 M. Which runs 16.63 KM with a carrying capacity of 3.50 Cumecs at head reach and another canal which takes off from right side earth bund @ Ch.1875 M. And runs of 4.86 Km with a carrying capacity of 1.00 Cumecs. The contemplated ayacut under left side canal is 7760 acres covering of 14 villages in Chinthakomma Dinne (M), which includes 300 Acres of Stabilization ayacut under two tanks i.e., ippapenta Tank, Chinthakomma Dinne Tank. The contemplated ayacut under Right canal is 1940 Acres in 1 villages of Chinthakomma Dinne Mandal which includes 100 acres of stabilization under Reddla Tank.

Salient Features
Name of the project : Buggavanka project
Village : Ippapenta
Madal : C.K.Dinne
District : YSR Kadapa
Latitude : 14° 23' 51" N
Longitude : 78° 50' 15" E
Year of starting : 1986
Year of completion : 2000
Mean Rainfall : 727mm
Catchment Area : 205.79 Sq KM
Maxium Flood Discharge : 32804 C/S
75% Dependable yeild : 27.6 M.cum
Area of Submergence : 154.74 Ha.
B.C Ratio : 2.25:1
Dam
Type of Dam : Earth Dam with Spillway
Length of Dam : 2060m
1)Earth Dam (Left side flank=1320m Right side flank=590m) : 1910m
2) Spillway : 57m
3) Gravity Dam : 93m
Maxium Height of Bund : 26m
Top width of Bund : 6m
Spill way gates
Size : 12 m x 6 m
Number : 4 Nos
Type of Spillway : Ogee
Type of gates : Radial Gates
Storage Capacity
Dead storage : 81 mcft
Live Sorage : 425 mcft
Gross Sorage : 506 mcft
Deepest Bed Level : +163.100 m
Sill Level of Sluices : +174.500 m
MDDL : +176.000 m
Crest Level : +180.000 m
F.R.L : +186.000 m
T.B.L : +189.000 m
No of head sluices : 2 Nos.

Canal System

Name of the canal left canal right canal Total
Length 16.63 KM 4.86KM
Vent Sizetd 1.20 m x 1.50 m 1.00 m x 1.50 m
Discharge 3.58 Cumecs .983 Cumecs
No of tanks feedings 2nos, ippapenta.&C.K.Dinne 1no Reddy cheruvu
Contemplated ayacut for kharrif in Acs 7460(canals) 300(tanks) 1840(canals)100(tanks) 9700(total)
Contemplated ayacut for Rabi in Acs 2230(canals) 300(tanks) 520(canals)100(tanks) 3150(total)
No of W.U.A 4 nos 1 no 5 nos(total)
No of villages benifited 14 nos 1 no 15 nos(total)
Maximum ayacut irrigated (2005-2006) : 3000Acs
Localisation of ayacut : An ayacut of 9434 Ac proposed under C.K. Dinne mandal,proposals sent to Dist. Collecter vide V.P.Division letter no 91m dt18-2-2008 for localisation of ayacut after joint inspection finalised ayacut is 7163
Budget for the Year 2015-16 : Plan - 0.5000 Crs
3. Veligallu Project
Preamble

Veligallu Project is constructed across Papagni river near Veligallu (V) in Galiveedu (M) of Kadapa District. The contemplated ayacut under the Project is 24,000 acres (2,000 acres in Rabi and 24,000 acres in khariff ) in Galiveedu, Lakkireddi palli and Ramapuram Mandals. The project is also contemplated to provide drinking water facility to Rayachoty town by sparing 0.30 TMC. The full capacity of the project is 4.64 TMC. The Administrative sanction accorded for the project is Rs. 208.72 crores, vide G.o.Ms. No.75, dated 29.9.2006.

Originally, the preliminaries of the project were taken up during 1995 But the main works were taken up during 2003 with meager funds from 2004 onwards sufficient funds were made available and project was taken up under Jalayagnam programme on priority basis with normal state plan funds. During 2006, the project was projected under AIBP (Prime ministers Package ) with 90% central assistance and 10% state share. The expenditure incurred under state plan funds upto 3/2006 is Rs.120.106 crores and in AIBP from 4/06 to 3/2012 is cumulative expenditure so far is Rs. 186.06 crores.

The project was completed and inaugurated by the then Hon'ble Chief Minister, Government of Andhra Pradesh on 22.12.2008.and water was released to the canal.

The main components of works under this project are

Head Works:( Lumpsum Contract works)

a) Formation of Earth Bund: Formation of earth bund was taken up during 2003 with an estimated cost of Rs. 1749.00 lakhs and the work is completed in all respects. The total expenditure incurred on this item of work is Rs. 1622.39 lakhs.

b) Construction of Spillway: Construction of spillway excluding erection of radial gates was taken up during 2004 with an estimated cost of Rs. 4745.00 lakhs and the work is completed in all respects. The total expenditure incurred for this item of work is Rs. 4706.81 lakhs.

CANALS :

(a) Canals package work (EPC System): Excavation of left canal with a length of 6.00km to feed an ayacut of 600 acres and right canal with a length of 55.10 km to feed an ayacut of 23,700 acres, Construction of CM&CD works, distributaries, field channels and fabrication and erection of spillway radial gates were taken up during 2005 on E.P.C. system and the works are completed. The estimated cost for this EPC package work is Rs. 8031.00 lakhs vide C.E.I No.442, dated 3.3.2006.

(b) Extension of Right Main Canal to feed two Tanks (L.S. Contract) Government has accorded administrative approval for Rs. 309.00 lakhs vide G.O.Ms. No.80 dated 6.10.2006. The work is intended to feed Dinnepadu and kalpanayuni cheruvu in Ramapuram Mandal. Which are located at the tail end of right main canal. The ayacut under these two tanks are 70 acres and 130 acres respectively. The work is completed.

Rehabilitation & resettlement package:

Due to construction of this project, one Village i.e., Veligallu with 5 hamlets namely (1) Krishnapuram Chinna Thanda (2) Pasalavandla palli (3) Veligallu Harijanawada (4) Indukurivandla palli and (5) Krishnapuram Pedda Thanda will be submerged.

The effected hamlets are proposed to be rehabilitated in two R&R centers. Government had accorded administrative approval for R & R Package for Rs. 1478.00 lakhs vide G.O. Ms.No. 151, dated. 14.12.2005. Since two Schedule Tribe hamlets are affected, necessary clearance from Ministry of Tribal Affairs, Government of India was obtained for the R&R plan in letter R. No. 20011/17/ 2005 CP& P (NGO) dated 13.7.2006.

R&R centre No.1 is located at the border of Anantapur District with an extent of 81.14 acres. And R&R center No.2 is located near the diversion road joining Veligallu- Thumu Kunta road with an extent of 9.28 acres. Total plots allotted in the two R&R centers for displaced families are 559, and almost all the houses were constructed by the beneficiaries themselves with financial support under R & R policy. The infrastructure facilities such as internal roads, Community hall, Grama Panchayat building, school building, drinking water facilities including construction of O.H.T. providing electrification etc., are completed.

Salient Features
Location : Site of the reservoir is across river Papagni near Veligallu village in Galiveedu mandal of Kadapa district in Andhra Pradesh
Longitude : 78° 28' 41" E
Latitude : 14° 01' 50" N
Proposed ayacut : 9713 ha (khariff) and 810 ha (rabi) = 10523 ha
Mandals benefited : Galiveedu, L.R.Palli and Ramapuram
Estimated cost : Rs.208.72 cr
Benefit Cost Ratio : 1.55
Cost per hectare : Rs.1.83 lakh
Catchment area : Gross catchment area: 3427.67 sq.mile / 8874.68 sq.km. Intercepted catchment area: 1871.76 sq.mile / 4846.00 sq.km.
75% dependable net yield at the site of reservoir : 162.440 M.cum./5.740 TMC
Utilization
Irrigation (as per crop water requirement) : 56.205 M.cum.(1.980 TMC)
Water supply to 18 villages enroute canal alignment : 2.555 M.cum.(0.090 TMC)
Evaporation losses : 17.000 M.cum.(0.601 TMC)
Total : 75.575 M.cum.(2.671 TMC)
Probable maximum flood discharge : 4273 cumec(151000 cusec)
Standards of reservoir
FRL : + 420.000 m(4.64 TMC)
MWL : + 421.000m
MDDL : + 408.750 m (1.2139TMC)
Sill of Head Regulators : + 407.000 m (0.93717TMC)
Gross storage capacity : 131.470 M.cum.(4.560 TMC)
Live storage capacity above MDDL : 95.100 M.cum. (3.360 TMC)
storage capacity below MDDL : 12.240 M.cum. (0.347 TMC)
Crest level of Spillway : + 409.00 m
Water spread area at FRL : 2690 acre
Spillway :
Length of spillway in between the abutments including thickness of piers : 72.00 m(209.5 to 281.5)
Type of spillway profiles : Ogee
Crest level : + 409.00 m
MWL : + 421.00 m
MWL :
Gates / Ungated : Radial gated
No. and size of gates in the ultimate stage : 5 Nos. of 12.00 m x 11.00 m
No. of piers and thickness of each of pier : 4 Nos. of 3.00 m. each
Probable maximum flood discharge : 151000 cusec
Deep bed level at spillway site : + 382.00 m
Deepest foundation level : + 381.00 m
Max. height of spillway over the deepest foundation level : 28.00 m
Non-Over Flow : The junction between the spillway and earth dam on either flank is connected by means of core wall taken down to rock level
Earth Dam
Length : 716.50 m
Left Flank : 209.50 m(0.00 to 209.5)
Right Flank : 507.00 m (281.5 to 788.5)
TBL : + 424.500 m
Free board : 4.50 m
Top width : 9.00 m
Head Regulators
Right side head regulator
Location : Located in the foreshore of reservoir at about 2 km from right side earth dam
Sill level : + 407.000 m
No. and size of vents : One vent of size 2.00 m x 1.50 m
Discharge : 0.172 cumec
Canals
Right Canal
Ayacut : 23400 acre (khariff) and 2000 acre (rabi)
Crop : ID khariff Groundnut and Chillies
Length : 57.15 km
Head discharge : 7.00 cumec
Left Canal
Ayacut : 600 acre (khariff)
Crop : ID khariff Groundnut and Chillies
Length : 6.00 km
Head discharge : 0.172 cumec
Villages benefited under the ultimate period of operation
Galiveedu,Payarampalli,Garugupalli, Gundlacheruvu,Pandillapali,Pandillapali,Kurnoorthala Maddievula,Ananthapuram,Nallaguttapalli,Chitloor,Tumukunta,L.R.Palli,B.Yerragudi,Dinnepadu Pulikunta,Suddamalla,Korlakunta
Budget for the Year 2015-16 : Plan 0.4700 Crs.
4. Lower Sagileru Project (L.S.P)
Preamble

The Lower Sagileru Project was constructed across the Sagileru River which is tributary to the Pennar river. The Project is located near the Vaddemanu Village, B. Kodur Mandal, Kadapa District to irrigate a total ayacut of 12,869 Acres.

The Project utilized 0.60 TMC of the available water and the Reservoir storage capacity is 0.169 TMC (gross) and 0.166 TMC (Net).

The cost of the Project is Rs. 0.51 Crores (SSR of 1954 year).

Lower sagileru project badvel constituency:

Salient Features
Location (Longitude ) : 78° 57" E
Catchment area : Free 466.33 sq.km.
Reservoir
FRL : 156.97 m or 515 ft
MWL : 156.970 m
Crest Level : 151.490 m or 504 ft
TBL : 160.630 m
Hoist Bridge level : 164.590 m
Deepest foundation level : 141.730 m
Total length of Dam : 1925 m
Capacity of the reservoir : 258 Mcft (Gross),200 Mcft (Live)
Spillway
Type : Ogee type
Length of spillway : 70.71 m
No. of vents : 5 Nos.
Size of vents : 12.19x5.49 m
Weight of steel shutter : 22 M.Tonnes
Weight of counter weight : 18 M.Tonnes
Designed flood discharge : 1585.70 Cumecs
Distributary system:
Left Canal
Canal of take at : 0.661 km of bund
Length of main canal : 22 kms
FSD : 1.05 m
Sill level of head sluice : 153.62m
Bed width of canal : 9.14
Bed fall of canal : 1 in 4500
Free board : 0.60 Mts
Discharge of the canal : 5.66 Cumecs
No.of tanks fed : 34 tanks
I.P. Created : 12869 acres
I.P. Utilized during 2011-12
Khariff : Nil
Rabi : 11500 acres
Components of Project : Earth dam, Spillway, vertical Gates
Mandals Benefited : B. Kodur, B.Mattam.
Water utilization : 1.4 TMC
Cropping pattern : Paddy
Budget for the Year 2015-16 : Plan - 0.6000 Crs.
5. Upper Sagileru Project
Preamble

Upper Sagileru anicut was constructed across Sagileru river near Ramapuram village in Kalasapadu mandal in the year 1896. It is a medium irrigation project and was maintained by the irrigation section, Porumamilla for Irrigation sub-division, Badvel under irrigation division, Kadapa. Later the anicut along with its 10 feeder tanks and 5 Nos of water users associations was transferred from Medium irrigation department to NTR.TGP.Division, Porumamilla for NTR TGP Circle, Kadapa under the control of the Chief Engineer (Projects), Irrigation, Kadapa as per the Govt. Memo.No.18955/Maj.Irrgn.V/2010, dt.7.3.2011.

The Upper Sagileru anicut have one regulator with 6 Nos of vents and escape / scouring regulator with 3 Nos of vents. The regulator gates are intact and requires minor repairs and painting.

The anicut body wall, abutments, wings, returns and solid apron are in good condition. Major portion of tanks on the D/s of apron was washed away and retrogression took place on the D/s side of apron. This damaged portion has to be rectified immediately to safeguard against further damage.

The Upper Sagileru project anicut was intended to feed 10 Nos of tanks with its feeder channel in PTS channel upto Porumamilla tank namely,

1) Kalasapadu tank
2) Pendlimarri tank
3) Pidugupalli tank
4) Akkasiddupalli tank
5) Chinthalapalli tank
6) Porumamilla tank
7) Markapuram tank
8) Rangasamudram tank
9) Reddikathera tank and
10) Katheragandla tank and the total ayacut under these 10 tanks is about 5335 Acres.

The total ayacut under Upper Sagileru project was divided into 5 Nos of water users associations under USP Committee done. These 5 Nos of water users associations are located in the villages of Kalasapadu and Porumamilla.

The maintenance of USP system is now brought under the control of Telugu Ganga Project and it is proposed to take up improvements to this system of tanks at a cost of Rs.3.22 Crores.

Tanks under Upper Sagileru Project Details of Ayacut

S.No Constituency Mandal Village Name of the Tank Ayacut(Acres)
1 Badvel Kalsapadu Kalsapadu Kalsapadu Tank 254.61
2 Badvel Kalsapadu Pendlimarri Pendlimarri Tank 129
3 Badvel Kalsapadu Sankavaram Pidugupalli Tank 156.28
4 Badvel Kalsapadu Sankavaram Akkisiddu Palli Tank 134.34
5 Badvel Kalsapadu Sankavaram Chintalapalli Tank 214.3
6 Badvel Porumamilla Porumamilla Porumamilla Tank 3864.67
7 Badvel Porumamilla Porumamilla Markapuram Tank 52.95
8 Badvel Porumamilla Rangasamudram Rangasamudram Tank 242.27
9 Badvel SAKN Katteragandla Reddikatava Tank 136.07
10 Badvel SAKN Katteragandla Katteragandla Tank 150.51
Total 5335
MINOR IRRIGATION PROJECTS
1.Pincha Project
Preamble

The Pincha Project was constructed across the Pincha River which is tributary to Penna River. The Project is located near the Mudumpadu Village, T. Sundupalli Mandal, Kadapa District to irrigate a total ayacut of 3773.41 acres.

The Project utilized 0.765 TMC of the available water and the Reservoir storage capacity is 0.3276 TMC (gross) and 0.3222 TMC (net).

The cost of the project is Rs. 0.60 Crores. (SSR of 1954 year).

Modernization of canals were taken up under APCBTMP Programme and the work is completed.

Salient Features
1. Latitude:13°-56'0"
2. Longitude:72°-01'-0"
3. FTL:+304.880 m
4. MWL:+304.880 m
5. TBL:+307.320 m
6. Free board:2.33 m
7. Free catchments Area:555.50 sqkm
8. Intercepted Area:1108.50 sqkm
9. Combined catchments Area:1664 SQKM
10. Observed MFD:58.000 cusecs (or) 1643 cumecs
11. Total yield available:765 mcft (or) 21.67 Mcum
12. No. of fillings:2.4
13. Dead storage:5.4 Mcft (or) 0.15 Mcum
14. Live storage:322.2 Mcft (or) 9.13 Mcum
15. Total storage:327.60 Mcft (or) 9.28 Mcum
16. Area of submersion:0.80 sqmiles 512 acres (or) 204.8 Hac.
17. Deep bed level of the river:+955.000 (or) 291.60 m
18.DAM DETAILS
Components of DamLength Height
Masonry non over flow dam406.00 (or) 123.80 m18.60 m
Composite dam498.00 (or) 151.80 m21.30 m
Earthen dam465.00 (or) 141.80 m11.60 m
19.REGULATOR DETAILS
S.No.Type of gateSize of gatesNosCrest levelWeight of shutterCounter weight
1Scour gate20'-0"x10'-0" (or) 6.10mx3.05m2954.00 (or) 291.16m10 T9 MT
2Flood gates40'-0"x15'-0" (or) 12.20mx4.57m3975.00 (or) 297.26m20 T19 MT
20. Additional surplus arrangements:Ground escape 100'-0" 30.50 m length
21. Length of the Hoist Bridge:226'-0" (or) 68.90 m
22. Width of Road over top of dam:10'-0" (or) 3.05 m
23. Total length of Dam:1595'-0" (or) 486.30 m
24. Date of commencement:01-10-1954
25. Date of completion:28-10-1960
CANALS
Description L.S. Main canal R.S. Main canal
Sill level965.00 ft (or) 294.21 m970.00 ft (or) 295.73 m
Bed width11.00 ft (or) 3.35 m13.00 ft (or) 3.96 m
FSD2.50 ft (or) 0.75 m2.25 ft (or) 0.69 m
Discharge32 cumecs(or) 0.91 cumecs45 Cusecs(or) 1.27 Cumecs
Length5 Miles - 5 Furlongs (or) 9.00 km4 Miles - 7 Furlongs (or) 7.80 km
Length Branch canal 3 Miles (or) 4.80 km3 Miles (or) 4.80 km
Ayacut wet1562.10 acres2211.31 acres
Total ayacut of the project: 3773.41 acres (or) 1528 Hectors.
VILLAGE BENEFITTED:

1.Mudumpdu, 2.Arogyapuram, 3.Kandulavaripalli, 4.Nandanaik Bidiki, 5.Voyalvoddu, 6.Machireddigari palli, 7. Sreeramulureddigari palli, 8. Kuravapalli, 9. Cherukuvari palli, 10. Peddinenikaluva, 11. Budidetipalli, 12. Edigapalli, 13. Rachapalli, 14.Reddivari palli, 15. Bestapalli, 16. Rayavaram.

2. Jerrikona Project
Preamble

The Project is constructed across the Bahuda river near Dinnemeedipalli (V) in Sambepalli (M) of Kadapa District to provide irrigation facility to an extent of 4900 acres in Sambepalli, Rayachoty and T. Sundupalli Mandals. with a storage capacity of 500 Mcft (11/2 fillings). The Government have accorded administrative approval for the work for Rs.46.63 Crores and 98% of work completed, the expenditure incurred so far is Rs.2643.27 Lakhs and balance work is to be completed. Further, the Government have accorded revised administrative approval vide G.O. Rt. No. 1071, dated 05.11.2013 for Rs 84.27 Crores which includes Rs 32.31 Crores for Head Works and Rs 51.96 Crores for construction of Canals for the proposed 5000 Acres ayacut. The Revised Estimate for canal was submitted to the Government for approval.

The above Scheme provides Water allocation of 730Mcft. Out of which Water for Irrigation is 526.70 Mcft. For drinking water purpose the allocation is 203.30Mcft.

1.Pileru Constituency :123 Mcft (Kalakada-33Mcft,Kalikiri-45Mcft,K.V.Palli-45Mcft)

2.Rayachoty Constituency : 80.30Mcft.

Salient Features
TBL :+ 351.000 mts.
MWL : + 349.000 mts.
FTL:+ 347.000 mts.
MDDL: + 331.000 mts.
MFD: + 64187 cusecs.
Catchment area: 201.00 Sq miles.
length of Bund: 720 mts.
Length of surplus weir: 194 mts.
Type of weir: Ogee type
Capacity of the reservoir : 0.50 TMC.
No. of fillings: 1.5 times.
No. of sluice : 1 No.
Discharge of Sluice : 2.83 cumecs.
Hydraulic Clearence:
Water Allocated :730 Mcft.
Water for Irrigation:526.70 Mcft.
For drinking water purpose:203.30 Mcft.
Pileru constituency : 123 Mcft (Kalakada = 33 Mcft, Kalikiri = 45 Mcft, K.V. Palli = 45 Mcft)
Rayachoty Constituency : 80.30 Mcft.
Existing Schemes

There are 1841 Nos of Minor Irrigation sources in the District with a contemplated Irrigation Potential of 1.11 Lakh Acres.

S.No Description No of Sources Ayacut in Acres
1 M.I. Sources > 100 Ac. 234 66,946
2 M.I. Sources < 100 Ac. 1542 32,295
Total 1841 111,225
MI TANKS ABOVE AND BELOW 100 ACRES
S.No Name of the Constituency Name of the Mandal M.I. Tanks above 100 acres M.I. Tanks below 100 acres
Nos. Ayacut Nos. Ayacut
1 2 3 4 5 6 7
1 Badvel Atloor 13 2233.71 29 992.35
Badvel 2 539.08 17 757.11
B.Kodur 2 303.15 13 423.88
Gopavaram 9 1762.69 15 690.30
Kalasapadu 5 2396.97 11 462.23
S.A. Kasinayana 14 544.97
Porumamilla 13 2666.19 29 822.99
Porumamilla 13 2666.19 29 822.99
Total: 58 15347.76 114 4148.86
2 Jammalamadugu Jammalamadugu 5 1244.71 14
Kondapuram 1 100.00 5 154.59
Muddanur 2 390.01 6 346.88
Mylavaram 6 950.11 13 380.29
Peddamudium 1 180.00 3 69.61
Yerraguntla 7 148.04
Total: 15 2864.83 48 1502.03
3 Kadapa Kadapa 3 535.14 7 297.24
Total: 3 535.14 7 297.24
4 Kamalapuram Chennur 2 43.10
C.K. Dinne 7 1475.87 21 838.48
Kamalapuram 2 952.00 22 998.36
Pendlimarri 2 562.08 13 479.13
Vallur 5 1128.81 16 713.62
V.N. Palli 1 210.10 4 144.03
Total: 17 4328.86 78 3216.72
5 Kodur Chitvel 14 4150.36 6 168.74
Kodur 10 4043.66 11 479.37
Obulavaripalli 9 3176.73 27 924.62
Penagalur 5 1901.00 16 503.32
Pullampet 11 1994.45 18 594.97
Total: 49 15266.20 78 2671.02
6 Mydukur B.Mattam 9 1528.55 17 480.76
Chapadu
Duvvur 3 519.39
Khajipet 2 1054.73
Mydukur 6 1548.96 9 375.42
Total: 20 4651.63 26 856.18
7 Proddatur Proddatur
Rajupalem
Total:
8 Pulivendla Chakrayapet 8 2614.26 71 1652.51
Lingala 3 182.06
Pulivendla 3 1033.65 26 433.29
Simhadripuram 1 320.00 4 81.32
Thondur 1 99.99 5 242.08
Vempalli 3 689.67 11 271.34
Vemula 4 1689.98 6 230.05
Total: 20 6447.55 126 3092.65
9 Rajampet Nandalur 4 1315.26 19 865.20
Rajampet 5 2991.20 24 726.75
Siddavatam 1 522.93 6 148.36
T.Sundupalli 5 4604.53 148 1952.31
Veeraballi 4 2423.72 97 2131.73
Vontimitta 4 1735.85 17 590.07
Total: 23 13593.49 311 6414.42
10 Rayachoty Chinnamandem 1 101.10 131 1729.97
Galiveedu 6 1165.39 241 2538.78
L.R. Palli 5 591.80 108 1438.17
Ramapuram 6 619.72 82 1711.44
Rayachoty 6 969.29 131 2088.07
Sambepalli 5 463.07 61 588.81
Total: 29 3910.37 754 10095.24
Grand Total: 234 66945.83 1542 32294.36
Mandal wise Localised ayacut particulars of M.V. Dam. Ayacut in Acres.
Sl. No.MandalVillageLocalised ayacutM.R.North canal Localised ayacutM.R.South canal Localised ayacutMandal ayacut
 Kadapa Disrict     
1 Mylavaram Dommaranandyal 1010.80 1010.80   4Villages - 2185.71
Chinnakomerla 767.37 767.37  
Veparala 189.72 189.72  
Thorrivemula 217.82 217.82  
2 Jammalamadugu S.Uppalapadu 2509.88 2509.88   14 Villages - 6570.92
Morogudi 228.17 228.17  
Jammalamadugu 557.34 557.34  
Goriganur394.37394.37 
Kanneluru374.63374.63 
Dharmapuram589.13589.13 
Danavulaopadu438.88438.88 
Devagudi321.05321.05 
P.Sugumanchipalli22.3422.34 
Ponnathota329.09 329.09
Thugutlapalli170.18 170.18
Sunnapurallapalli39.42 39.42
Peddadandlur261.25 261.25
Siregepalli335.19 335.19
3PeddamodiemGundlakunta1050.401050.40 16 Villages - 16432.47
Medidenne988.21988.21 
Chinnamodiem775.26775.26 
Chidipiralladinne568.93568.93 
Palur2317.452317.45 
B.Venkatapuram274.99274.99 
Bodithippanapadu188.23188.23 
Gopulapuram306.46306.46 
Nagarajupalli714.00714.00 
Peddapasupula4499.684499.68 
Chinnapasupula886.15886.15 
Nemilladinne563.92563.92 
N.Kottalapalli1956.281956.28 
Garisaluru596.57596.57 
Ulavapalli90.1890.18 
J.Kottapalli655.76655.76 
4RajupalemVellala2109.152109.15 13 villages - 14482.13
Parlapadu1377.581377.58 
Paidala676.17676.17 
Gadegudur494.56494.56 
Daddanala593.79593.79 
Arkatavemula2194.452194.45 
Kulur100.21100.21 
Pottipadu1925.331925.33 
Korrapadu1151.031151.03 
Rajupalem350.55350.55 
Tangutur142.93142.93 
Chinnasettipalli1134.011134.01 
Velavali2232.372232.37 
5ProddaturPeddasettipalli1722.541722.54 11 Villages - 7948.45
Bollavaram840.23840.23 
Proddatur1604.961604.96 
Gopavaram209.89209.89 
T.Chowdur1168.681168.68 
Modamedipalli259.51259.51 
Kottapeta176.45176.45 
Kakirenepalli201.43201.43 
Sankarapuram303.92303.92 
Kothapalli335.03335.03 
Rameswaram1125.81 1125.81
6YerraguntlaChinnadandlur2024.80 2024.808 villages - 10545.69
P.Gopulapuram44.34 44.34
Kalamalla624.93 624.93
Illur1459.54 1459.54
Malepadu895.65 895.65
Potladurthy2140.25 2140.25
Hanumaguthy3196.93 3196.93
Kanchanagaripalli159.25 159.25
7KamalapuramYerragudipadu2583.11 2583.117 Villages - 10584.57
Kokatam4421.75 4421.75
Sambatur1411.29 1411.29
Pachikalapadu818.15 818.15
Merapuram564.74 564.74
Vibrapuram541.03 541.03
Gangavaram244.50 244.50
Total Kadapa District73 Villages - 68749.9452 Villages - 45,358.7421 Villages - 23,391.2073 Villages - 68749.94
 Kurnool Dist     
8 Chagalamarri Rajoli 1096.88 1096.88   1096.88
9 Sajamala Nossam 428.28 428.28   428.28
10 Uyyalavada Kakaravada 311.93 311.93   311.93
    Total Kurnool District. 1837.09 1837.09   3 Villages -1837.09
    Total 70,587.03 Say 70,590 Acres. 55 Villages. 47195.83 Acres. 23391.20 Acres. 76 Villages - 70,587.03 Acres.
MANDAL WISE AYACUT UNDER PULIVENDLA BRANCH CANAL
S.NoName of the VillageAyacut in AcresName of the MandalName of the District
1Singavaram63.91YellanuruAnantapur
2Kallur216.22YellanuruAnantapur
3Vennapusa Palli695.51YellanuruAnantapur
4Pathapalli1422.14YellanuruAnantapur
5Kasrla Kunta857.87YellanuruAnantapur
6Yellanuru1505.14YellanuruAnantapur
7Venkaiah Kaluva563.94KondapuramKadapa
8Chenamaneni Palli224.57KondapuramKadapa
9Lingamaneni Palli3.84KondapuramKadapa
10Gurijala675.57SimhadripuramKadapa
11Simhadripuram1212.92SimhadripuramKadapa
12Nidivelagala1451.00SimhadripuramKadapa
13Hima Kuntla1223.60SimhadripuramKadapa
14Bidinamcherla383.61SimhadripuramKadapa
15Kasanuru2790.95SimhadripuramKadapa
16Lomada1741.68SimhadripuramKadapa
17Ankalammaguduru3396.79SimhadripuramKadapa
18Aghraharam741.06SimhadripuramKadapa
19Balapanoor5243.24SimhadripuramKadapa
20Kamasamudram591.80LingalaKadapa
21Ramapuram231.68LingalaKadapa
22Dondlavagu637.93LingalaKadapa
23Teluru2152.70ThonduruKadapa
24Maduru1307.59ThonduruKadapa
25Bhadram Palli180.05ThonduruKadapa
26Enagaloor2695.20ThonduruKadapa
27Thondur897.58ThonduruKadapa
28Gundlamadugu1468.75ThonduruKadapa
29Saidapuram951.72ThonduruKadapa
30Agaduru1812.22ThonduruKadapa
31Jalaparthi508.97ThonduruKadapa
32Palaur841.16ThonduruKadapa
33Santhakovvuru326.73ThonduruKadapa
34Yadava Kunta528.19ThonduruKadapa
35Thimmapuram Pet897.18ThonduruKadapa
36Gotutu985.87ThonduruKadapa
37Ragimanipalli626.23PulivendlaKadapa
38Achivelli1646.41PulivendlaKadapa
39Rastamvaripalli88.55PulivendlaKadapa
40Ulimella935.38PulivendlaKadapa
41Rayalapuram305.00PulivendlaKadapa
42Nallacheruvupalli1332.67VemulaKadapa
43Chintalajooturu449.75VemulaKadapa
44Gollala Guduru1513.08VemulaKadapa
45Pendluru392.88VemulaKadapa
46Pernapadu370.05VemulaKadapa
47Chagaleru1353.71VemulaKadapa
48Gondipalli405.08VemulaKadapa
49Kothapalli775.44VemulaKadapa
50Alavalapadu620.00VempalliKadapa
51Kattaluru843.78VempalliKadapa
52Naguru144.95VempalliKadapa
53Tallapalli492.93VempalliKadapa
54Vempalli1854.19VempalliKadapa
Total55578.96 or 55580 Acres
Major Projects (Completed)
S.NoName of the Project Ayacut created in AcresAyacut Utilised in Acres
1.Kurnool-Cuddapah Canal92,00092,000
2.Pulivendula Branch Canal55,58022,040
3.Mylavaram Reservoir70,59031,000
Medium Projects (Completed)
S.No Name of the Project Ayacut created in Acres Ayacut Utilised in Acres
1 Lower-Sagileru Project (LSP) 12,869 9,072
2 Upper-Sagileru Project (USP) 5,335 5,335
3 Pincha Project 3,773 2,203
4 Buggavanka Project 12,850 Nil
5 Annamayya Project 22,500 10,236
6 Veligallu Project 24,000 Nil
MANDAL WISE AYACUT PARTICULARS OF
MEDIUM IRRIGATION PROJECTS IN KADAPA DISTRICT
S.NoName of the ProjectName of the MandalAyacut in Acres
1Annamayya ProjectRajampeta8,053
Pullampeta2,183
 Total 10,236
2Buggavanka ProjectC.K.Dinne9,400
3Lower Sagileru ProjectB.Kodur5271.86
Badvel5561.15
B. Mattam2222.31
 Total 13055.32
Major Projects (Ongoing)
S.No Name of the Project Ayacut contemplated in Acres Ayacut created in Acres Ayacut Utilised in Acres
1 NTR TGP (SPVBR) 1,77,000 1,26,000 60,000 + 14000 (MI Tanks)
2 GNSS Project Phase-I :
a. Gandikota Reservoir - - -
b.Vamikonda Sagar Reservoir 10,000 1,000 -
c. Sarvaraja Sagar Reservoir 25,000 - -
d. GKLI Scheme- Paidipalem Reservoir 47,500 - -
3 Gandikota-CBR Lifts 20,750 - -
4 GNSS Project Phase-II 1,32,000 - -
5 PBC Modernization- 55580 New -36900 92,480 48,800 -
6 CBR Right Canal 59,400 20,280 -
7 Mylavaram Modernization 70,590 60,000 -
STATEMENT SHOWING THE CAPACITY OF S.P.V.B.RESERVOIR AT B.MATTAM
S.NoContour Elevation in MArea in M.Sqm.Mean area in M.Sqm.Contour IntervalCapacity in M.CumCumulative capacity in M.CumContour Elevation in 'M' Capacity in TMCCumulative capacity in TMC
11720  0017200
2172.1      0.00010
3172.2      0.00010
4172.3      0.00010
5172.4      0.00010
6172.5      0.00010.001
7172.6      0.00010.001
8172.7      0.00010.001
9172.8      0.00010.001
10172.9      0.00010.001
11173      0.00010.001
12173.1      0.00010.001
13173.2      0.00010.001
14173.3      0.00010.001
15173.4      0.00010.001
16173.5      0.00010.002
17173.6      0.00010.002
18173.7      0.00010.002
19173.8      0.00010.002
20173.9      0.00010.002
211740.060.0320.060.061740.00010.002
22174.1      0.00090.003
23174.2      0.00090.004
24174.3      0.00090.005
25174.4      0.00090.006
26174.5      0.00090.007
27174.6      0.00090.007
28174.7      0.00090.008
29174.8      0.00090.009
30174.9      0.00090.01
31175      0.00090.011
32175.1      0.00090.012
33175.2      0.00090.013
34175.3      0.00090.014
35175.4      0.00090.015
36175.5      0.00090.016
37175.6      0.00090.016
38175.7      0.00090.017
39175.8      0.00090.018
40175.9      0.00090.019
411760.4650.262520.5250.5851760.00090.02
42176.1      0.002450.022
43176.2      0.002450.025
44176.3      0.002450.027
45176.4      0.002450.03
46176.5      0.002450.032
47176.6      0.002450.035
48176.7      0.002450.037
49176.8      0.002450.04
50176.9      0.002450.042
51177      0.002450.045
52177.1      0.002450.047
53177.2      0.002450.049
54177.3      0.002450.052
55177.4      0.002450.054
56177.5      0.002450.057
57177.6      0.002450.059
58177.7      0.002450.062
59177.8      0.002450.064
60177.9      0.002450.067
611780.91250.6887521.37751.96251780.002450.069
62178.1      0.004150.073
63178.2      0.004150.077
64178.3      0.004150.081
65178.4      0.004150.086
66178.5      0.004150.09
67178.6      0.004150.094
68178.7      0.004150.098
69178.8      0.004150.102
70178.9      0.004150.106
71179      0.004150.111
72179.1      0.004150.115
73179.2      0.004150.119
74179.3      0.004150.123
75179.4      0.004150.127
76179.5      0.004150.131
77179.6      0.004150.135
78179.7      0.004150.14
79179.8      0.004150.144
80179.9      0.004150.148
811801.4451.1787522.35754.321800.004150.152
82180.1      0.00650.159
83180.2      0.00650.165
84180.3      0.00650.172
85180.4      0.00650.178
86180.5      0.00650.185
87180.6      0.00650.191
88180.7      0.00650.198
89180.8      0.00650.204
90180.9      0.00650.211
91181      0.00650.217
92181.1      0.00650.224
93181.2      0.00650.23
94181.3      0.00650.237
95181.4      0.00650.243
96181.5      0.00650.25
97181.6      0.00650.256
98181.7      0.00650.263
99181.8      0.00650.269
100181.9      0.00650.276
1011822.21751.8312523.66257.98251820.00650.282
102182.1      0.00980.292
103182.2      0.00980.302
104182.3      0.00980.311
105182.4      0.00980.321
106182.5      0.00980.331
107182.6      0.00980.341
108182.7      0.00980.351
109182.8      0.00980.36
110182.9      0.00980.37
111183      0.00980.38
112183.1      0.00980.39
113183.2      0.00980.4
114183.3      0.00980.409
115183.4      0.00980.419
116183.5      0.00980.429
117183.6      0.00980.439
118183.7      0.00980.449
119183.8      0.00980.458
120183.9      0.00980.468
1211843.352.7837525.567513.551840.00980.478
122184.1      0.014950.493
123184.2      0.014950.508
124184.3      0.014950.523
125184.4      0.014950.538
126184.5      0.014950.553
127184.6      0.014950.568
128184.7      0.014950.583
129184.8      0.014950.598
130184.9      0.014950.613
131185      0.014950.628
132185.1      0.014950.642
133185.2      0.014950.657
134185.3      0.014950.672
135185.4      0.014950.687
136185.5      0.014950.702
137185.6      0.014950.717
138185.7      0.014950.732
139185.8      0.014950.747
140185.9      0.014950.762
1411865.14.22528.45221860.014950.777
142186.1      0.01990.797
143186.2      0.01990.817
144186.3      0.01990.837
145186.4      0.01990.857
146186.5      0.01990.877
147186.6      0.01990.896
148186.7      0.01990.916
149186.8      0.01990.936
150186.9      0.01990.956
151187      0.01990.976
152187.1      0.01990.996
153187.2      0.01991.016
154187.3      0.01991.036
155187.4      0.01991.056
156187.5      0.01991.076
157187.6      0.01991.095
158187.7      0.01991.115
159187.8      0.01991.135
160187.9      0.01991.155
1611886.16755.63375211.267533.26751880.01991.175
162188.1      0.024751.2
163188.2      0.024751.225
164188.3      0.024751.249
165188.4      0.024751.274
166188.5      0.024751.299
167188.6      0.024751.324
168188.7      0.024751.348
169188.8      0.024751.373
170188.9      0.024751.398
171189      0.024751.423
172189.1      0.024751.447
173189.2      0.024751.472
174189.3      0.024751.497
175189.4      0.024751.522
176189.5      0.024751.546
177189.6      0.024751.571
178189.7      0.024751.596
179189.8      0.024751.621
180189.9      0.024751.645
1811907.847.00375214.007547.2751900.024751.67
182190.1      0.029751.7
183190.2      0.029751.73
184190.3      0.029751.759
185190.4      0.029751.789
186190.5      0.029751.819
187190.6      0.029751.849
188190.7      0.029751.878
189190.8      0.029751.908
190190.9      0.029751.938
191191      0.029751.968
192191.1      0.029751.997
193191.2      0.029752.027
194191.3      0.029752.057
195191.4      0.029752.087
196191.5      0.029752.116
197191.6      0.029752.146
198191.7      0.029752.176
199191.8      0.029752.206
200191.9      0.029752.235
2011929.018.425216.8564.1251920.029752.265
202192.1      0.0322.297
203192.2      0.0322.329
204192.3      0.0322.361
205192.4      0.0322.393
206192.59.069.0350.54.517568.6425192.50.0322.425
207192.6      0.0362.461
208192.7      0.0362.497
209192.8      0.0362.533
210192.9      0.0362.569
211193      0.0362.605
212193.1      0.0362.641
213193.2      0.0362.677
214193.3      0.0362.713
215193.4      0.0362.749
216193.5      0.0362.785
217193.6      0.0362.821
218193.7      0.0362.857
219193.8      0.0362.893
220193.9      0.0362.929
22119411.3210.191.515.28583.92751940.0362.965
222194.1      0.042753.008
223194.2      0.042753.051
224194.3      0.042753.093
225194.4      0.042753.136
226194.5      0.042753.179
227194.6      0.042753.222
228194.7      0.042753.264
229194.8      0.042753.307
230194.9      0.042753.35
231195      0.042753.393
232195.1      0.042753.435
233195.2      0.042753.478
234195.3      0.042753.521
235195.4      0.042753.564
236195.5      0.042753.606
237195.6      0.042753.649
238195.7      0.042753.692
239195.8      0.042753.735
240195.9      0.042753.777
24119612.8712.095224.19108.11751960.042753.82
242196.1      0.0493.869
243196.2      0.0493.918
244196.3      0.0493.967
245196.4      0.0494.016
246196.5      0.0494.065
247196.6      0.0494.114
248196.7      0.0494.163
249196.8      0.0494.212
250196.9      0.0494.261
251197      0.0494.31
252197.1      0.0494.359
253197.2      0.0494.408
254197.3      0.0494.457
255197.4      0.0494.506
256197.5      0.0494.555
257197.6      0.0494.604
258197.7      0.0494.653
259197.8      0.0494.702
260197.9      0.0494.751
26119814.8813.875227.75135.86751980.0494.8
262198.1      0.05594.856
263198.2      0.05594.912
264198.3      0.05594.968
265198.4      0.05595.024
266198.5      0.05595.08
267198.6      0.05595.135
268198.7      0.05595.191
269198.8      0.05595.247
270198.9      0.05595.303
271199      0.05595.359
272199.1      0.05595.415
273199.2      0.05595.471
274199.3      0.05595.527
275199.4      0.05595.583
276199.5      0.05595.639
277199.6      0.05595.694
278199.7      0.05595.75
279199.8      0.05595.806
280199.9      0.05595.862
28120016.7515.815231.63167.49752000.05595.918
282200.1      0.061555.98
283200.2      0.061556.041
284200.3      0.061556.103
285200.4      0.061556.164
286200.5      0.061556.226
287200.6      0.061556.287
288200.7      0.061556.349
289200.8      0.061556.41
290200.9      0.061556.472
291201      0.061556.534
292201.1      0.061556.595
293201.2      0.061556.657
294201.3      0.061556.718
295201.4      0.061556.78
296201.5      0.061556.841
297201.6      0.061556.903
298201.7      0.061556.964
299201.8      0.061557.026
300201.9      0.061557.087
30120218.0817.415234.83202.32752020.061557.149
302202.1      0.066557.216
303202.2      0.066557.282
304202.3      0.066557.349
305202.4      0.066557.415
306202.5      0.066557.482
307202.6      0.066557.548
308202.7      0.066557.615
309202.8      0.066557.681
310202.9      0.066557.748
311203      0.066557.815
312203.1      0.066557.881
313203.2      0.066557.948
314203.3      0.066558.014
315203.4      0.066558.081
316203.5      0.066558.147
317203.6      0.066558.214
318203.7      0.066558.28
319203.8      0.066558.347
320203.9      0.066558.413
32120419.5818.83237.66239.98752040.066558.48
322204.1      0.071758.552
323204.2      0.071758.624
324204.3      0.071758.695
325204.4      0.071758.767
326204.5      0.071758.839
327204.6      0.071758.911
328204.7      0.071758.982
329204.8      0.071759.054
330204.9      0.071759.126
331205      0.071759.198
332205.1      0.071759.269
333205.2      0.071759.341
334205.3      0.071759.413
335205.4      0.071759.485
336205.5      0.071759.556
337205.6      0.071759.628
338205.7      0.071759.7
339205.8      0.071759.772
340205.9      0.071759.843
34120621.0320.305240.61280.59752060.071759.915
342206.1      0.077559.993
343206.2      0.0775510.07
344206.3      0.0775510.148
345206.4      0.0775510.225
346206.5      0.0775510.303
347206.6      0.0775510.38
348206.7      0.0775510.458
349206.8      0.0775510.535
350206.9      0.0775510.613
351207      0.0775510.691
352207.1      0.0775510.768
353207.2      0.0775510.846
354207.3      0.0775510.923
355207.4      0.0775511.001
356207.5      0.0775511.078
357207.6      0.0775511.156
358207.7      0.0775511.233
359207.8      0.0775511.311
360207.9      0.0775511.388
36120822.8821.955243.91324.50752080.0775511.466
362208.1      0.083411.549
363208.2      0.083411.633
364208.3      0.083411.716
365208.4      0.083411.8
366208.5      0.083411.883
367208.6      0.083411.966
368208.7      0.083412.05
369208.8      0.083412.133
370208.9      0.083412.217
371209      0.083412.3
372209.1      0.083412.383
373209.2      0.083412.467
374209.3      0.083412.55
375209.4      0.083412.634
376209.5      0.083412.717
377209.6      0.083412.8
378209.7      0.083412.884
379209.8      0.083412.967
380209.9      0.083413.051
38121024.3223.6247.2371.70752100.083413.134
382210.1      0.089613.224
383210.2      0.089613.313
384210.3      0.089613.403
385210.4      0.089613.492
386210.5      0.089613.582
387210.6      0.089613.672
388210.7      0.089613.761
389210.8      0.089613.851
390210.9      0.089613.94
391211      0.089614.03
392211.1      0.089614.12
393211.2      0.089614.209
394211.3      0.089614.299
395211.4      0.089614.388
396211.5      0.089614.478
397211.6      0.089614.568
398211.7      0.089614.657
399211.8      0.089614.747
400211.9      0.089614.836
40121226.3825.35250.7422.40752120.089614.926
402212.1      0.095215.021
403212.2      0.095215.116
404212.3      0.095215.212
405212.4      0.095215.307
406212.5      0.095215.402
407212.6      0.095215.497
408212.7      0.095215.592
409212.8      0.095215.688
410212.9      0.095215.783
411213      0.095215.878
412213.1      0.095215.973
413213.2      0.095216.068
414213.3      0.095216.164
415213.4      0.095216.259
416213.5      0.095216.354
417213.6      0.095216.449
418213.7      0.095216.544
419213.8      0.095216.64
420213.9      0.095216.735
42121427.5226.95253.9476.30752140.095216.83
422214.1      0.1007616.931
423214.2      0.1007617.032
424214.3      0.1007617.132
425214.4      0.1007617.233
426214.5      0.1007617.334
427214.6      0.1007617.435
428214.7      0.1007617.535
429214.8      0.1007617.636
430214.9      0.1007617.737
431215      0.1007617.838
432215.1      0.1007617.938
433215.2      0.1007618.039
434215.3      0.1007618.14
435215.4      0.1007618.241
436215.5      0.1007618.341
437215.6      0.1007618.442
438215.7      0.1007618.543
439215.8      0.1007618.644
440215.9      0.1007618.744
441216      0.1007618.845
442216.1      0.1007618.946
443216.2      0.1007619.047
444216.3      0.1007619.147
445216.4      0.1007619.248
446216.529.528.512.571.275547.5825216.50.1007619.349
447216.6      0.105819.455
448216.7      0.105819.561
449216.8      0.105819.666
450216.9      0.105819.772
451217      0.105819.878
452217.1      0.105819.984
453217.2      0.105820.09
454217.3      0.105820.195
455217.4      0.105820.301
456217.530.3629.93129.93577.5125217.50.105820.407