IRRIGATION PROFILE OF SRIKAKULAM DISTRICT

INTRODUCTION

Srikakulam District is the extreme Northeastern District of Andhra Pradesh situated within the geographic Co-ordinates of 18° -20' and 19° -10' of Northern latitude and 83° -50' and 84° -50' of Eastern longitude. The District is skirted to a distance by Kandivalasagedda, Vamsadhara and Bahuda at certain stretches of their courses while a line of heights of the great Eastern Ghasts run from North East. Vizianagaram District flanks in the south and west while Orissa bounds it on the north and Bay of Bengal on the East. The total area of the District is 5,837 Sq. Kms. It has a population of 27,03,114 persons according to the 2011 census. The District derived its name from Srikakulam its headquarters town. Srikakulam District was carved out in 1950 by bifurcating it from Visakhapatnam District, it remained unaffected in its territorial jurisdiction for quite some time. But in November, 1969 the District lost 63 villages from Saluru Taluk and 44 villages from Bobbili Taluk on account of their transfer to the then newly constituted Gajapathinagaram Taluk of Visakhapatnam District. Again in May, 1979, the District had undergone major territorial changes on account of the formation of new District with head quarters at Vizianagaram which involved transfer of Salur, Bobbili, Parvathipuram and Cheepurupalli Taluks to the new District.

The Nagavali, Vamsadhara, Survarnamukhi, Vegavathi, Mahendratanaya Gomukhi, Champavathi, Bahuda and Kumbikota gedda are the important rivers of the District. The Vamsadhara river rises in the Eastern Ghats of Orissa State and enters Srikakulam District in Bhamini Mandal and finally falls in to the Bay of Bengal near Calingapatnam. The Nagavali and Survarnamukhi rivers also originate in the Eastern Ghats while Nagavali in Vangara Mandal and the confluence joins the Bay of Bengal at Kallepalli near Srikakulam rising in Pachipenta hills the Vegavathi river flows from west to east, ultimately joining the river Suvarnamukhi, Gomukhi joins Suvarnamukhi at Sirlam village of Vizianagaram District, Mahendratanya, which is Atributory of Vamsadhara joins the later at Komanapalli village in Hiramandalam Mandal. Another river of the same eastern Ghats flows through Mandasa and Sompeta Mandalas and falls into Bay of Bengal at Baruva. The Bhuda river also rises in the eastern Ghats and enters Srikakulam District at Boddabada village of Ichapuram Mandal and flows through Ichapauram and Kaviti, Mandasa and enters into Bay of Bengal at Donkuru. The District has a seacoast of 193 Kms.

Classification Of Geographical Area Of Srikakulam District
Classification of geographical area Area in Acres Percentage of geographical area
Total geographical area 14,42,322.70 100
Forest area 1,69,611.91 11.76
Cultivable area 9,00,375.57 62.43
Barren and Un-cultivable area 1,19,616.17 8.29
Land put to Non-Agricultural use and other 2,52,719.05 17.52
Sown Area 7,50,922.07 52.06
Irrigated area 6,47,656.52 44.90
Normal Average Rainfall 1162mm ---
Cultivable waste 1,487.54 0.10
Permanent pastures and other grazing land 2,327.68 0.16
Miscellaneous 18,411.42 1.28
Other fallow land 36,345.94 2.52
Current fallows 89,857.92 6.23
Others 1,022.99 0.07
Irrigation area % with reference to cultivable area 71.93
Details Of Irrigation Projects
S.No Name of the Projects Total IP created in Acres
A Completed Projects
I Major Irrigation Projects
1 Vamsadhara Project Stage-I 1,48,230
2 Narayanapuram Anicut 39,436
3 Thotapalli Regulator 55,285
II Medium Irrigation Projects
1 Gorle Sriramulu Naidu Madduvalasa Reservoir Project (Phase-I) 24,700
III Minor Irrigation Projects
1 Minor Irrigation schemes--6Nos 11,958
2 Minor Irrigation Tanks(Above 1000Ac)--375Nos 69,183
3 Open Head Channels, Gedda Systems, Anicuts & Other sources (Above 100 Ac.)--80Nos 40,339
4 Minor Irrigation Tanks ( Below 100 Ac.)--478Nos 18,380
5 Open Head Channels, Gedda Systems, Anicuts & Other sources (Below 100 Ac.)--21Nos 1,069
6 Small Minor Irrigation Tanks (P.R.Tanks)--6937Nos 1,51,531
7 Minor Irrigation tanks - SMI Divn.,--546Nos 16,716
8 Check Dams SMI Divn--503Nos 14,228
IV Lift Irrigation Schemes under APSIDC
1 Lift Irrigation Schemes--45Nos 23,655
B Ongoing Projects
I Major Irrigation Projects
1 B.R.R. Vamsadhara Project Phase- I of Stage-II 62,280
2 B.R.R. Vamsadhara Project Phase- II of Stage-II 45,000
3 Thotapalli Barrage 63,933
II Medium Irrigation Projects
1 Gorle Sriramulu Naidu Madduvalasa Reservoir Project (Phase-I) 12,500
2 Off shore Resevoir on River Mahendra tanaya 24,600
III Minor Irrigation Projects
1 Minor Irrigation schemes --4Nos 3,273
IV Lift Irrigation Schemes under APSIDC
1 Lift Irrigation Schemes--4Nos 5,910
COMPLETED MAJOR IRRIGATION PROJECTS
1. B.R.R. Vamsadhara Project Stage-I
Preamble

B.R.R. Vamsadhara Project Stage-I envisages construction of Barrage across the River Vamsadhara at Gotta (V) in Hiramandalam (M) of Srikakulam District to irrigate an ayacut of 1,48,230 acres in 398 villages of 12 Mandals with Left Main Canal for a length of 104.24 Km. and 68 Nos. of distributaries. The project was taken up in 1970 and water was first let out for irrigation in 1977. The updated estimated cost of the project is Rs.109.00 Crores with S.S.R. 1997-98.

Salient Features
Location : Gotta (V), Hiramandalam (M),Srikakulam Dist
Longitude : 83° 58' 0'' E
Latitude : 18° 12' 0'' N
Ayacut : 1,48,230 Acres
Mandals benefited : 12 Nos i.e,Hiramandalam,Saravakota, Jalumuru, Polaki Narasannapeta, Kotabommali, Santabommali, Tekkali, Nandigam, Palasa, Vajrapukoturu & Meliaputti.
Gross Storage : 17329 Cum
FRL : 38.100 M
MDDL : 34.44 M (Sill Level of Left Head Sluice)
Dependable net Yield : 57.50 TMC (AP Share at Gotta barrage)
Maximum Flood Discharge : 2, 90,000 Cusecs
Canals
Left Main Canal
Length : 104.24 Km.
Section : 29.26 X 2.90m
Water allocation (Irrigation) : 17.841 TMC
Water allocation (Drinking) : ----
Water allocation(Industries) : Nil
Cropping Pattern : 1,48,230 Acres for Paddy
Present Stage : Completed and under O&M
Funding Details : Normal State Plan
Project Starting Year : 1971
Project Completion Year : 1977
Budget for the Year 2015-16 : Plan - 18.0000 Crs. Non-Plan - 0.6000 Crs.
Mandal-Wise Ayacut Under Right Main Canal, High Level Canal & Flood Flow Canal In Vamsadhara Project
S.NoMandalNo. of Villages under CommandAyacut in Acres
1Bhamini97082
2Kothuru1410697
3HLM73117
4Sarubujjili498493
5LN Peta3915769
6Burja286184
7Amadalavalasa308559
8Srikakulam2217800
9Gara2729579
Total225107280
B.R.R. Vamsadhara project - stage-I left main canal Mandal-wise ayacut utilized under Khariff 2014-15
S.No Mandal No. of Villages under Command Mandal-wise Registered Ayacut in Acres
1 Hiramandalam 12 2008
2 Saravakota 13 2782
3 Jalumuru 57 16347
4 Narasannapeta 44 21463
5 Polaki 49 22708
6 Kotabommali 29 8884
7 Santhabommali 40 26383
8 Tekkali 35 14947
9 Nandigam 51 12492
10 Palasa 36 8362
11 Vajrapukotturu 31 11796
12 Meliaputti 1 58
Total 398 148230

* Though Pathapatnam Mandal comes to the Left side of the River, there is no command under it under Vamsadhara Project

B.R.R. Vamsadhara project - stage-I left main canal Assembly Constituency-wise registered ayacut details
S.No Mandal No. of Villages under Command Mandal-wise Registered Ayacut in Acres
1 Pathapatnam 13 2067
2 Narasannapeta 128 49412
3 Tekkali 245 94224
4 Palasa 12 2527
Total 398 148230
B.R.R. Vamsadhara project - phase-I of stage-II right main canal Assembly constituency-wise - Mandal-wise ayacut details
Sl. No.Name of Assembly ConstituencyName of MandalNo. of VillagesAyacut in AcresConstituency-wise Total ayacut in Acres
1PathapatnamHiramandalam4896.51896.51
2AmadalavalasaSarubujjili4313726.2134004.16
LN Peta268492.66 
Burja133227.1 
Amadalavalasa308558.19 
Sub-Total11234004.16 
3SrikakulamSrikakulam2217800.5247379.33
Gara2729578.81 
Sub-Total4947379.33 
Total82280
2. Narayanapuram Anicut Scheme
Preamble

The Narayanapuram Anicut across Nagavali River was constructed during the year 1959-1963 in Narayanapuram village of Burja Mandal to Irrigate an ayacut of 39,179 Acres, through left and right main canals in Burja, Amdalavalasa, Srikakulam , Gara Santhakaviti, Ponduru and Etcherla Mandals of Srikakulam District.

The Right Canal is running for a length of 50.6Km and distributaries running for a length of 162.00 Km to Irrigate an ayacut of 18,362 Acres in Santakaviti, Ponduru, Etcherela, Amdalavalasa and Srikakulam Mandal.

The left canal is running for a length of 39.00 Km to irrigate an ayacut of 18691 Acres .

Sailent Features
Longitude : 83° 48' 0'' E
Latitude : 18° 23' 0'' N
Ayacut : 37053 Acres
Catchment Area : 5079.62 KM2
Yield from catchment : 1,117.57 mm3
Average Mansoon Rainfall : 1024 mm
Designed Flood Discharge : 4,876.7 M3/Sec
Maximum Flood Discharge (5/90) : 6,910.08 M3/Sec
Anicut
Anicut
Length of Anicut : 357 Met.
Crest level of Anicut : + 28.04 M
Shutters 118 Nos Size : 3.025M x 1M
Top of falling shutter : +28.95 M
Top of Flood bank Level : +32.77 M
Head Sluice 2 Nos : 8 Vents
Size : 2.28 M x 1.05 M
Sill Level : + 27.13
Scovering Sluices 2 Nos : 8 Vents
Size : 1.80 M x 2.10 M
Sill Level : + 26.82 M
Down Stream Solid Apron Length : 360 Mts
Top Level : 27.14 M
Canals
Left Canal : 39.00 KM
Left high level Canal : 14.70 KM
Discharge : 13.28 M3/Sec
Ayacut : 21045 Acres
Bed Level at Start : + 27.13 M
Bed Fall : 1 in 4000
Depth of Flow : 1.20 M
Right side canal
Length of Canal : 50.60 KM
Discharge : 13.28 M3/Sec
Ayacut : 18362 Acres
Bed Level at Start : + 27.13 M
Bed Fall : 1 in 4000
Depth of Flow : 1.20 M
Budget for the Year 2015-16 : Plan - 1.70000 Crs
Statement Showing The Mandal Wise Ayacut Irrigated During Khariff - 2014 In Respect Of Narayanapuram Anicut
S.No Name of the Mandal Ayacut localised Ayaccut Irrigated during Khariff 2014
Srikakulam District Vizianagaram District Total
a Narayanapuram left side channel
Amadalavalasa 7215.00 --- 7215.00 6421.00
Srikakulam 5894.00 -- 5894.00 5776.00
Gara 3867.00 -- 3867.00 3790.00
Burja 1715.00 -- 1715.00 1681.00
Total 18691.00 -- 18691.00 17668.00
b Narayanapuram Right side channel
Santhakaviti 4221.00 --- 4221.00 4052.00
Ponduru 6966.54 -- 6966.54 6827.00
Etcherla 7174.41 -- 7174.41 6313.00
18361.95 -- 18361.95 17192.00
Total 37052.95 -- 37052.95 34860.00
Statement Showing The Mandal Wise Ayacut Irrigated During Khariff - 2014 In Respect Of Narayanapuram Anicut
S.No Name of the Mandal Ayacut localised Ayacut Irrigated during Khariff 2014
Srikakulam District Vizianagaram District Total
a Nagavali Left side channel
Veeraghattam 14330.00 --- 14330.00 13757.00
Palakonda 13080.00 -- 13080.00 12688.00
Garugubilli -- 2341.99 2341.99 2248.00
Ziyyamavalasa -- 1850.00 1850.00 1776.00
27410.00 4191.99 31601.99 30469.00
b Nagavali Right side channel
Vangara 4298.00 --- 4298.00 4126.00
Baligipeta -- 550.00 550.00 534.00
Garugubilli -- 3093.5 3093.5 3000.00
4298.00 3643.50 7941.50 7660.00
Total 31708.00 7835.49 39543.49 38129.00
3. Thotapalli Regulator
Preamble

The existing Thotapalli regulator is the first diversion work on river Nagavali, which was constructed with RR masonry during the year 1907-1908. The Thotapalli old regulator consisting of mainly the following components:

1. Nagvali Left Main canal of length 37.626 Km with 8 nos of branch canals and distributory system was executed during the year 1908-1934 including construction of CM & CD works with RR masonry in Surki mortar to feed an ayacut of 31200 acres.

2. Nagavali Right main canal of length 20.016 Km with 11 nos of branch canals and distributory system was executed during the year 1934-1958 including construction of CM & CD works with RR masonry in surki mortar to feed an ayacut of 9000 acres.

3. 9 Nos of open head channels on left side of river to feed an ayacut of 10606 acres and 5 nos open head channels on right side river to feed an ayacut of 13194 Acres.

As such the total ayacut being irrigated under the above regulatory system is 64000 Acres. It became old and showing signs of deterioration. It is proposed to construct a barrage near Thotapalli village across Nagavali River at about 500 mts U/S of existing Thotapalli regulator in order to save the existing ayacut of 64000 Acres and to irrigate additional ayacut of 120000 Ac in Vizianagaram and Srikakulam districts including drinking water supply in 24 villages en-route the proposed Right Main canal.

Sailent Features
Location : Thotapalli (Village) Garugubelli (Mandal)
Longitude : 80° 36' 15'' E
Latitude : 18° 46' 52'' N
Ayacut (Stabilized) : 55,285 Acres
Mandals Benefitted : (1) Veeraghattam (2) Palakonda (3) Vongara
Dependable Net Yield : 6700 Mcft.
Water Allocation : 5.780 TMC.
Maximum Flood Discharge : 1,13,200 C/s
Canals
Length : Left Main Canal : 37.40 KM
Right side Canal : 19.80 KM
Discharge : Left Main Canal : 414 C/s
Right side Canal : 106 C/s
Ayacut : Left Main Canal : 38,708 Acres
Right side Canal : 16,577 Acres
Cropping Pattern : Khariff (Paddy)
Villages Benefited : 32 Nos
Rehabilitation : - NIL -
ONGOING MAJOR IRRIGATION PROJECTS
1. B.R.R.Vamsadhara Project Phase-I of Stage-II
Preamble

The Phase-I of Stage-II of Vamsadhara Project is intended to create an Irrigation potential of 62,280 Acres under Right Main Canal. The project components are (1) Construction of head regulator on Right Bank of Vamsadhara River @ 750m U/s of Gotta Barrage (2) Excavation of Right Main Canal for a length of 52.973 Km with distributory net work from1R to 37TE to command the ayacut.

Salient Features
F.S.L of Canal of head reach : + 38.484M
Bed level of canal at Head reach : + 36.074M
Starting section of canal : 20.25 x 2.41M
Length of Canal : 52.973Km
Designed discharge : 1867 Cusecs up to 2.67 Km & 865 Cusecs in D/S
Estimated Cost : Rs. 123.936 crores
Revised Estimated Cost : Rs. 209.00 Crores
Mandals benefited : Sarubujjili, Amadalavalasa, Gara,Srikakulam and Burja, L.N.Peta,Hiramandalam
Village benefited : 165 Nos
Cropping pattern: : Paddy: 32,280 Acres
Chillies:30,000 Acres
Total:62,280 Acres
Irrigation Potential

The project is intended to create irrigation potential to an extent of about 62,280 Acres in 7 mandals of about 165 villages in Pathapatnam, Amadalavalasa & Srikakulam Constituencies of Srikakulam District utilizing 7.353 TMC of water.

Components

The project comprised of construction Head Regulator, etc., construction Right Main Canal for a length of 52.973Km with 1R, 37TE distributories and field channels.

Status

The Right Main Canal was completed upto 15.466 duly linking, Yeragam, Purushothapuram and Bhyri Open Head Channels through 11L Distributory restoring lower riparian rights for 20,000 Acres under NABARD RIDF-II .The works from Km 15.466 to 52.973 including all distributories were taken up under A.I.B.P and Normal State Plan Funds. An expenditure of Rs. 145.906 Cores was incurred under the Project. An irrigation potential of 62,280 acres was created by Khariff 2012.

Administrative approval was accorded to Project revised estimate by the Government of an amount Rs. 209.00 Crores vide G.O. Rt. No. 734, dated 27.12.2011 and the new / additional imperative works like CC lining of Canal at vulnerable reaches, protection walls etc. are under progress.

The ayacut under the Right Main Canal of 62,280 acres is being irrigated every year. Further the 20,000 acres proposed under Sugarcane in Vamsadhara Project Phase-II of Stage-II is developed for Paddy crop supplemented with the waters diverted from Gotta Barrage.

B.R.R. Vamsadhara Project - phase-I of stage-II Right Main Canal (Excluding The Open Head Channels Registered Ayacut) Assembly Constituency-Wise - Mandal-Wise Ayacut Utilized Under Khariff 2014-15
S.No Name of Assembly Constituency Name of Mandal No. of Villages Ayacut in Acres Constituency-wise Total ayacut in Acres
1 Pathapatnam Hiramandalam 4 746.51 6325.6
LN Peta 26 5579.09
2 Amadalavalasa Sarubujjili 43 8452.51 16637.07
Burja 13 2073.96
Amadalavalasa 30 6110.6
3 Srikakulam Srikakulam 22 12104.89 27716.33
Gara 27 15611.44
Total 165 50679

The Reconcilation of above irrigation potential created and localization of the above ayacut under Right Main Canal is under progress by the Project authorities in co-ordination with Revenue & Agricultural Departments.

Mandal-Wise Ayacut Particulars Under R/S Open Head Channels (linked by right main canal of B.R.R. Vamsadhara Project phase-I of stage-II)
S.No Name of Assembly Constituency Name of Mandal No. of Villages Open Head Channel Registered Ayacut in Acres
1 Pathapatnam LN Peta 2 415.27
2 Amadalavalasa Sarubujjili 16 5053.70
Amadalavalasa 3 394.94
3 Srikakulam Srikakulam 7 3495.63
Gara 20 10640.00
Total 48 19999.54

Water Uses Associations were already formed for the above ayacut in the year 2000

2. B.R.R. Vamsdhara Project Phase-II of Stage-II
Preamble

The Phase-II of Stage-II of Vamsadhara Project is intended to create an Irrigation Potential of 45,000 Acres and stabilizing the existing ayacut of 2,10,510 Acres under Left & Right Main Canals. The cost of the project is Rs. 933.90 Crores and administratively approved vide G.O.Ms. No. 33, dated 25.02.2005.

The Project Components are:


1) Construction of a side weir on Right bank of Vamsadhara River at Katragada (Village) Bhamini Mandal for diverting the flood waters into flood flow canal. A regulator for regulatory flows into flood flow canal and silt excluder for diverting excess water into the river.


2) A Flood Flow Canal about 34 Km length with two balancing reservoirs at Singidi and Parapuram Villages en-route irrigating 20,000 Acres.


3) Hiramandalam Reservoir with 19.05 Tmc capacity with head sluices for High Level Canal, Link Canal and Spillway regulator.


4) A High Level Canal to irrigate 5,000 Acres.


5) A Link Canal to connect the Right Main Canal @ Ch. 2.670 km from Hiramandalam Reservoir to supplement the deficit requirement under Left & Right Main Canals.


Salient Features
Location
Latitude : 18° 59' 34'' N
Longitude : 83° 48' 12'' E
District : Srikakulam (Andhra Pradesh)
Mandal : Bhamini
Village : Near Katragada Village on Alikam - Bathili Road
Hydrology
Catchment Area at Katragaa : 7895 Sq.Km (3050 Sq.m)
Mean Annual Rainfall : 1194 mm (47'')
Average Monsoon Rainfall : 1067 mm (42'')
Maximum Flood Discharge during September 1980 at Neradi site. : 6.00 Lakh cusecs (16,900 cumecs)
75% dependable yield at Gotta (115 TMC) agreed by Orissa and Andhra Pradesh : 3256.46 M.Cum
Component Features
Description Details As per Approved Hydraulic Particulars
Side Weir
Length : 300 m
Crest Level : +70.400 m
D/s F.S.L : +70.240 m
Discharge : 6400 Cusecs
Average Bed Level of River : +69.500 m
Head Regulator
Crest Level : +69.500 m
Flood Flow Canal (from km 0.000 to km 5.214 i.e., up to Infall Regulator of Singidi Balancing Reservoir)
Discharge : 8000 Cusecs
Canal Section : 36.50 m x 5.084 m
Bed Fall : 1 in 12,000
Canal Bed Level @ km 0.000 : +66.370 m
Full Supply Level @ km 0.000 : +71.454 m
Canal Bed Level @ km 5.214 : +65.936 m
Full Supply Level @ km 5.214 : +71.020 m
Singidi Balancing Reservoir
T.B.L. : +73.870 m
F.R.L. : +70.870 m
M.W.L. : +72.370 m
Storage Capacity : 0.0686 tmc
Length of Earth Bund : 2.10 km
Self Catchment Area : 12.608 Sq. km
Water Spread Area @ F.R.L. : 0.799 Sq. km
Flood Flow Canal (from km 6.834 i.e., Outfall Regulator of Singidi Balancing Reservoir to km 26.217 i.e., Infall Regulator of Parapuram Balancing Reservoir)
Discharge : 8000 Cusecs
Canal Section : 36.50 m x 4.45 m
Canal Bed Level @ km 6.834 : +65.555 m
Full Supply Level @ km 6.834 : +70.005 m
Canal Bed Level @ km 26.217 : +63.940 m
Full Supply Level @ km 26.217 : +68.390 m
Parapuram Balancing Reservoir
T.B.L. : +72.200 m
F.R.L. : +68.240 m
M.W.L. : +69.750 m
Storage Capacity : 0.404 tmc
Length of Earth Bund : 2.500 km
Self Catchment Area : 13.19 Sq. km
Water Spread Area @ F.R.L. : 2.565 Sq. km
Flood Flow Canal (from km 29.127 i.e., Outfall Regulator of Parapuram Balancing Reservoir to km 33.107 i.e., Infall Regulator of Hiramandalam Reservoir)
Discharge : 8000 Cusecs
Canal Section : 36.50 m x 4.45 m
Canal Bed Level @ km 29.127 : +63.082 m
Full Supply Level @ km 29.127 : +67.532 m
Canal Bed Level @ km 33.107 : +62.750 m
Full Supply Level @ km 33.107 : +67.200 m / 67.050 m
Hiramandalam Reservoir
T.B.L. : +73.600 m
F.R.L. : +67.056 m
M.D.D.L. : +45.110 m
Gross Storage Capacity : 19.359 tmc
Live Storage Capacity : 16.685 tmc
Length of Earth Bund : 7.20 km
Self Catchment Area : 79.00 Sq. km
Water Spread Area @ F.R.L. : 31.67 Sq. km
Irrigation Potential

The project is intended to create irrigation potential to an extent of 45,000 Acres and stabilization of existing ayacut under Left & Right Main Canals as follows.

1) Under Flood Flow Canal : 20,000 Acres.

2) High Level Canal : 5,000 Acres.

3) Right Main Canal (Sugarcane Crop) : 20,000 Acres

4) Stabilization Under existing Left & Right Main Canals : 2,10,510 Acres

The new & stabilizing ayacut exists in Palakonda, Pathapatnam, Amadalavalasa, Palasa, Tekkali, Narasannapeta, Srikakulam Assembly constituencies of Srikakulam District.

Land Acquisition and R & R

Total Land Acquisition involved is 11,542 Acres. 4 Nos of L.A Units have been establishment for L.A & R.R. 34 villages are affected under the proposed reservoirs. Socio Economic Survey is completed. 11,238 Acres of Land has been handed over to the Department. An amount of Rs. 233.01 Crores has been incurred towards Land Acquisition and Rs. 95.93 Crores under R&R. Land acquisition for important components has been completed.

3. Thotapalli Barrage Project
Preamble

The existing Thotapalli Regulator on River Nagavali was constructed in the year 1908. The Govt. of Andhra Pradesh have accorded Revised administrative approval for Rs 774.90 Cr vide G.O Ms No 78, I & CAD PW - M&MI CA.I(2) Dept, Dated 05-11-2012 for construction of Thotapalli Barrage Project to provide additional irrigation facilities to new ayacut of 1,35,000 Acres(136191) including 15,000 Acs of Gajapathinagaram Branch Canal under the project (9300+47,958+15,000 =72,258 Acres in Vizianagaram District, 13 Mandals & 63933 Acres in Srikakulam District,7 Mandals) besides stabilizing existing ayacut of 64,000 Acres (8715 Acres in Vizianagaram District & 55285 Acres in Srikakulam District) under Thotapalli regulator and providing drinking water supply to 24 Villages en route of the canal by feeding 42 Nos. of tanks.

Salient features:
Source : River Nagavali (Langulya)
Location : Thotapalli(v), Garugubilli (M),Vizianagaram District
Catchment area : 4455 sqkm.
Latitude : 18° 47' 30'' N
Longitude : 83° 25' 24'' E
Total available yield from catchment area : 44.000 TMC.
Yield allocated for Andhra Pradesh as per Inter state Agreement : 16.000 TMC
Proposed yield to be utilised in this Thotapalli Barrage Scheme : 15.895 TMC
Storage capacity of Barrage at FRL/MWL (+105.00 Mts) : 2.509 TMC (71.05 M.Cum)
C.C.A. Under this Project : 1,84,000 Acers
Existing Ayacut (Khariff Paddy) : 64,000 Acres
Proposed additional Ayacut (Ground nut in Khariff) : 1,20,000 Acres
Spillway
Type of spillway : Ogee
Total length : 117 Mts
No.of Radial Gates : 8 No.s
Size of vent : 12.00Mts x 7.00Mts
Crest level : +98.00Mts
Designed Discharge : 3234Cumecs
Foundation level : +87.50Mts
Earth Dam
Total Length : 8.20Km (Both sides)
Top width : 6.00Mts
Maximum height : 20.20Mts (R/S Earth Dam)
F.R.L/M.W.L : +105.00Mts
T.B.L : +109.00Mts
M.D.D.L. : +100.00Mts
Left Head Sluice
Sill level : +97.00 Mts
No.of vents : 2 No.s (Size 2.00Mx2.25M)
Right Head Sluice
Sill level : +97.40 Mts
No.of vents : 2 No.s (Size 4.30Mx2.50M)
Discharge : 34.23 Cumecs
Length of Right Main Canal : 107.00 Kms
BRIEF NOTE ON THOTAPALLI BARRAGE PROJECT

The existing Thotapalli Regulator on River Nagavali was constructed in the year 1908. The Govt. of Andhra Pradesh have accorded Revised administrative approval for Rs 774.90 Cr vide G.O Ms No 78, I & CAD PW - M&MI CA.I(2) Dept, Dated 05-11-2012 for construction of Thotapalli Barrage Project to provide additional irrigation facilities to new ayacut of 1,35,000 Acres(136191) including 15,000 Acs of Gajapathinagaram Branch Canal under the project (9300+47,958+15,000 =72,258 Acres in Vizianagaram District, 13 Mandals & 63933 Acres in Srikakulam District,7 Mandals) besides stabilizing existing ayacut of 64,000 Acres (8715 Acres in Vizianagaram District & 55285 Acres in Srikakulam District) under Thotapalli Regulator and providing drinking water supply to 24 Villages en route of the canal by feeding 42 Nos. of tanks.

New ayacut proposed 63,933 Acres

Existing ayacut stabilization 55,285 acres.

The total Mandals benefited are :
Benefited Mandals : Regidi Amadalavalasa, Vangara, Rajam, Santhakaviti, G.Sigadam, Laveru and Ranastalam.
Benefited villages : 132 Nos in Srikakulam District.
Total Ayacut in Vizianagaram District (80973 Acres)
Stabilized : 8715 Acres
Proposed New Ayacut : 72258 Acres
Total Ayacut in Srikakulam District (119218 Acres)
Stabilized : 55285 Acres
Proposed New Ayacut : 63933 Acres

The total yield available from catchment area at site is 32 TMC and the yield proportionally allocated to Andhra Pradesh state as per Inter State agreement dated: 15.12.1978 is 16.00TMC.


The Utilization is 15.890TMC


Description As per allocation of CWC As G.O.Ms. No .83 I&CAD PW Dt 15.11.2012
Irrigation 13.985TMC 15.485TMC
Drinking water 0.320TMC 0.320TMC
Industrial Demand 0.640TMC Notional
Evaporation 0.945TMC 0.985TMC
Total 15.890 TMC 16.790 TMC

Surplus water of Nagavali from the run of the river to be drawn during the flood season above FRL of Thotapalli Barrage (Phase 1 - M/S Alfa infraprop) 1.25TMC


Package-2

The Right Main Canal and distributory system from Km 52.45 to km 117.89 is awarded to M/s Maytas - NCC (JV) Hyd vide Agmt no. 5/2004-2005 for Rs. 170.02 Crores.


(A)Works
Revised Estimate Amount : Rs. 179.56 Crores
Agreement Value (PA&SE/TTPRC/5/2004-05 Dated 25.10.2004) : Rs.170.02 Crores
Original Estimate Amount : Rs.178.56 Crores
Cumulative Expenditure up to 31.05.2013 : Rs.132.344 Crores (Including escalation, Seignorage Re-imbursement, NAC, Labour cess)
Value of work done up to 10.06.2013 : Rs. 132.928 Crores (Including escalation)
Value of work done up to 10.06.2013 : Rs 120.716 Crores (Excluding escalation)
Expenditure incurred during this year : Rs 0.865 Crores
Further funds required : Rs 49.304 Crores (Excluding escalation)
Bills pending at PAO : RS. 1.81 Crores
As per Revised
EPC Package 2 works : 179.56 Crores.
Additional items
POL s, Cement, Steel : Rs 9.98 Crores
Labour Cess : Rs 1.76 Crores
NAC/CMRF : Rs 0.1578 Crores
Seignorage Re imbursement : Rs 0.8749 Crores
Total excluding LA : Rs 192.333 Crore
(B)Land Acquisition: SKLM VZM TOTAL
Required : 1921Ac. 2529Ac. 4450 Ac.
Requisitioned : 1819 Ac 2436 Ac 4255 Ac
Requisition to be Submitted by the agency : 100 Ac 92 Ac 192 Ac
Acquired : 1449 Ac 2019 Ac 3468 Ac
Network (tentative) : 81511
COMPLETED MEDIUM IRRIGATION PROJECT
1. Sri Gorle Sriramulu Naidu Madduvalasa Reservoir Project
Preamble

Madduvalasa Reservoir Project is a Medium Irrigation Project for which envisages formation of Reservoir across Suvarnamukhi river a tributary of Nagavali River. The project is intended to serve an ayacut of 24,700 acres in 6 Mandals in Srikakulam District under Stage ( which was completed in the year 2002 and water is being supplied to the contemplated ayacut.

Salient Features
Name of the Project : Sri Gorle Sriramulu Naidu MadduvalasaReservoir Project
Location : Near Madduvalasa Village,Vangara Mandal,Srikakulam District
Longitude : 83° 37' 20'' E
Latitude : 18° 35' 30'' N
River : Suvarnamukhi
Basin : Nagavali
Catchment Area : 2536 sq.km
Maximum Flood Discharge : 5590 cumec
Max Designed discharge of spillway : NA
Mean Annual Rain fall : 950 mm
Yield available : 123.34 M.cum (4.356 TMC)
Capacity of the Reservoir : 95.51 M.cum (3.372 TMC)
Water spread area : 26.73 Msq.m ( 6600 Acers)
Total Length of Dam : 2325.00 Meters
Top width of Earth Dam : 5.00 Meters
Full Reservoir Level : + 65.00 Meters
Crest Level of Spillway Ogee : + 57.37 Meters
Lowest Bed Level : + 52.30 Meters
Gross Storage : 95.51 M.cum (3.372 TMC)
Dead Storage up to MDDL : 1.83 M.cum ( 68M.cft)
Live Storage : 93.58 M.cum ( 3305 M.cft)
Gates : 11 Nos of Radial Gates of size 12.00Mt X 7.63 Mt
Sill Level of Gate : + 57.16 Meters
Top Level of Gates : + 65.096 Meters
Length of Spillway : 159.50 mt
Bucket invert Level : +46.00 Meters
Lip wall Level : +47.60 Meters
Surplus course Level : +52.31 Meters
Width of Road way : 4.25 mt
Iteam LMC RMC R.M.C.Extn
Canal Length : 1.672 km 50.704 km 5.000 km
Ayacut : 385 Ha(950 Ac) 9615Ha(23750Ac) 5058Ha.(12500Ac)
Discharge at Head : 0.712 cumec 16.80 cumec 3.89 cumec
Sluice No & Size of Vents : 1(0.60mt X1.00mt) 2(1.50mt X2.20 mt) ------
Sill Level : +58.050 mt +56.850 mt +48.145 mt
Bed Width : 1.50mt 12.20 mt 4.00 mt
F.S.Depth : 0.63mt 2.15 mt 1.30 mt
Bed Fall at Head : 1 in 4000 1 in 9000 1 in 4500
F.S.L.at Head : +58.780 mt + 59.000 mt +49.445 mt
Velocity at Head : 0.376 m/sec 0.6406 m/sec 0.544 m/sec
Budget for the Year 2015-16 : Plan - 5.0000 Crs.
Total I.P created in Acres : 24,700
1.Madduvalasa Reservoir Project Stage-II:-
Preamble

Additional water requirement to Irrigate 12,500 Acres in stage II was calculated as per modified Penman method is 0.862 TMC and the total requirement is arrived as 4.730 TMC for entire ayacut will be within the limits of yield allocated by C.W.C. to Madduvalasa Project i.e. 4.960 T.M.C. It is proposed to create an additional ayacut of 12,500 acres duly extension of Right Main Canal for 5.00 KM distance and excavation of 2 distributories, benefiting 4 Mandals i.e. G.Sigadam(1395 Acres), Ponduru (4,933 Acres), Laveru(5010 Acres) and Etcherla(1075 Acres) total 12,500 Acres.

2. Offshore Reservoir Scheme on River Mahendratanaya:-

Mahendratanaya River is a tributary to the Vamsadhara River. The Mahendratanaya River takes its origin near Tuparasingi (V) in Orissa State. The river Mahendratanaya travels 27 km in the state of Andhra Pradesh and joins Vamsadhara River at about 4 km above the Gotta Barrage at Gulumuru village. Out of 27 km, the river flows 19 km in Andhra Pradesh and about 8 km as common boundary between Andhra Pradesh & Orissa.

The basin has a total drainage area of 1233 Sq.km till its confluence with Vamsadhara River. The Catchment Area is mostly hilly. The basin receives abundant supply under the influence of both the South-West and North-East monsoons with an average annual rainfall being 1126 mm (47'). Rainfall in this Catchment is erratic and high peaks of discharge occur for a few days in the monsoon period accounting for substantial part of the yield during the sub peaks. For effective utilization of the water, it is proposed to divert the flows in to a diversion channel, taking off from the River near Chapara Village of Meliaputti Mandal in Srikakulam District.

The Mahendratanaya River flows through a very backward region in Orissa and Andhra Pradesh states. The development of irrigation under this river is very meager till its confluence with Vamsadhara River.

There are no Inter State Agreements on utilization of water in Mahendratanaya River and there are no restrictions to utilize the share of water in the Vamsadhara basin.

However, for beneficially utilizing the waters in Vamsadhara Basin, the States of Orissa and Andhra Pradesh have agreed in 1962 that the yield of the river at Gotta will be about 115 TMC and that these waters shall be shared on half and half basis (vide D.O. Lr. No. Nil, dated 03.10.1962 from Sri B. Patnaik, Honorable Chief Minister of Orissa addressed to Sri N. Sanjeeva Reddy, Honorable Chief Minister of Andhra Pradesh).

Salient Features
Name of Work : Excavation of Flood Flow Canal taking off from Mahendratanaya River near Chapara Village of Meliyaputti Mandal in Srikakulam Dist. Formation of off-Shore Reservoir near Regulapadu Village and Formation of Canal net work from reservoir including Distributory network.
Administrative Approval : G.O.Ms No.1, Dt. 04.01.2007 for Rs. 127.00 Crores
Name of the Executing agency : M/s SVEC-INDU(JV), Hyderabad
Agreement No / Value : 46SE/2007-08,Dt.18.02.2008/Rs.123.25 Crores
Ayacut contemplated : 46SE/2007-08,Dt.18.02.2008/Rs.123.25 Crores
Components of the Scheme : 1) Excavation of Flood Flow Canal to develop an ayacut of 24600 Ac including construction of CM & CD works distributory System. 2) Construction of Head Regulator 3) Formation of Reservoir with Spillway etc. at Regulapadu and canal distributory system.
Length of the Flood Flow Canal : 13.60 km
Design Discharge of the F.F.C : 1200 Cusecs
No. of villages benefited : 108 villages in Nandigam, Meliaputti, Palasa & Tekkali Mandals
Regulapadu Reservoir
Length of the Earthen Bund : 2.485 Km
F.R.L. of the Reservoir : + 52.500 M
T.B.L. of the Reservoir : + 55.600 M
Capacity of the Reservoir : 1.860 TMC
Self Catchment of the Reservoir : 0.465 TMC
Water Utilization
Irrigation Requirements : 1.890 tmc
Drinking Water Supply : 0.108 tmc
Total : 2.000 tmc
Total Water Availability
75% Divertible Yield from Mahendratanaya River : 1.631 tmc
Self Catchment Yield of Regulapadu Reservoir : 0.465 tmc
Total : 2.096 tmc
Land Acquisition
Total Land required : 2500 Ac
Cumulative Expenditure up to 5/2015 : 53.93 Crs
Budget for the Year 2015-16 : Plan - 6.0000 Crs.
Mandal-Wise Ayacut Particulars Of Offshore Reservoir Scheme On River Mahendratanaya
S.No Name of the District Name of the Mandal Contemplated Ayacut in Acres
1 Srikakulam District Meliaputti 3890 Acres
2 Nandigama 12090 Acres
3 Tekkali 1820 Acres
4 Palasa 6800 Acres
Total 24600 Acres
Water User Associations (WUAs)
ABSTRACT
S.No Name of the Project Name of the District Number of DC's Number of WUA's Ayacut in Acres
I Major Irrigation
a BRR Vamsadhara Project Srikakulam 08 54 145244
b Narayanapuram Anicut Srikakulam 05 25 37053
c Thotapalli Old Regulator Srikakulam & Vizianagaram 05 25 39544
total 18 104 221841
II Medium Irrigation
a Pydigam Project Srikakulam -- 5 4986
III Minor Irrigation
a M.I.Tanks/ Sources Srikakulam -- 398 135944
Grand Total 18 507 362771
Capacity Table of Gotta Barrage
S.NoElevation (m)Area (Sq.m)Mean Area (Sq.m)Contour Interval (m)Capacity in between Contours (Cubic meters)Cumulative Capacity (Million Cubic meters)Cumulative Capacity (Million Cubic Feet)Capacity (TMC)
134.001,28,000
10,88,0001.0010,88,000
235.0020,48,000 1.08838.420.038
24,83,2001.0024,83,200
336.0029,18,400 3.571126.110.126
49,89,6001.0049,89,600
437.0060,60,800 8.560302.290.302
87,68,0001.0087,68,000
538.001,14,75,200 17.329611.970.612
1,41,34,4001.001,41,34,400
639.001,67,93,600 31.4631111.111.111
1,90,97,6001.001,90,97,600
740.002,14,01,600 50.5601785.511.790
2,35,87,2001.002,35,87,200
841.002,57,72,800 74.1472618.482.620
2,79,48,8001.002,79,48,800
942.003,01,24,800 102.0953605.453.605
Mahendratanaya Reservoir Project Offshore Reservoir At Regulapadu Contour Capacities
Contour Interval (m)Area (sqm)Cumulative area (sqm)Mean area (sqm)Quantity (cum)Capacity in mcftCapacity in tmcCumulative in tmcREMARKS
12345678910
32.000
33.000140925.53740925.5370.0000.0000.0000.00000.0000
34.000189449.949130375.48685650.51285650.5123.0250.00300.0030
35.0001206757.612337133.098233754.292233754.2928.2550.00830.0113
36.0001276524.708613657.806475395.452475395.45216.7890.01680.0281
37.0001315167.347928825.153771241.480771241.48027.2360.02720.0553
38.0001270069.4621198894.6151063859.8841063859.88437.5700.03760.0929
39.0001262243.9351461138.5501330016.5831330016.58346.9700.04700.1398
40.0001252429.4751713568.0251587353.2881587353.28856.0570.05610.1959
41.0001253600.2391967168.2641840368.1451840368.14564.9930.06500.2609
42.0001264831.3962231999.6602099583.9622099583.96274.1470.07410.3350
43.0001276360.2252508359.8852370179.7732370179.77383.7030.08370.4187
44.0001305193.8232813553.7082660956.7972660956.79793.9720.09400.5127
45.0001321171.8963134725.6042974139.6562974139.656105.0320.10500.6177
46.0001396596.4993531322.1033333023.8543333023.854117.7060.11770.7355
47.0001380678.2083912000.3113721661.2073721661.207131.4300.13140.8669
48.0001377759.6884289759.9994100880.1554100880.155144.8230.14481.0117
49.0001417459.5054707219.5044498489.7524498489.752158.8640.15891.1706
50.0001482926.4475190145.9514948682.7284948682.728174.7630.17481.3453
51.0001483584.5005673730.4515431938.2015431938.201191.8290.19181.5372
52.0001504178.4406177908.8915925819.6715925819.671209.2700.20931.7464
52.5001282911.6746460820.5656319364.7283159682.364111.5840.11161.8580
Gross Capacity at +52.500 FRL is 1.858 TMC
Capacity Table Of Hiramandalam Reservoir (Dead Storage Level=45.110M, FRL= 67.056M)
S.NoReservoir Elevation (m)Water spread Area (sqm)Water spread Area (Acres)Cumulative capacity in TMC
133827585204.50
2342019569499.050.049
3352936614725.650.136
4363765774930.540.254
53744476981099.050.399
63852165161289.030.569
73959792561477.510.767
84068733611698.440.993
94178213751932.701.253
104287307622157.421.545
114396697042389.441.870
1244107704632661.442.230
1345.11118633222931.492.674
1446125730323106.863.058
1547136549613374.213.521
1648147344853640.974.022
1749155592543844.784.557
1850164542514065.935.122
1951174376854308.955.720
2052183167234526.166.352
2153191368524728.827.013
2254198321074900.627.701
2355204219875046.388.412
2456212972375262.669.148
2557223645295526.409.919
2658231387475717.7110.723
2759238412235891.3011.552
2860246158356082.7112.408
2961254703216293.8513.292
3062262883146495.9814.206
3163272649896737.3315.152
3264282410316978.5116.132
3365292548887229.0417.147
3466304399147521.8718.201
3567.056316731777826.6119.359
MINOR IRRIGATION
Minor Irrigation Statement Showing The Mandal Wise Ayacut Irrigated During Khariff- 2014 In respect of M.I.tanks/ sources and small M.I (P.R) tanks
S.No Name of the Mandal M.I. Tanks/ Sources   Small M.I. (P.R) Tanks
No. of Sources Regd. Ayacut in Acres Irrigated Ayacut in acres during Khariff 2014 No. of Tanks Regd. Ayacut in Acres Irrigated Ayacut in acres during Khariff 2014
1Itchapuram207462.767015.00 1292585.781778.00
2Kaviti5758.00705.00 1032195.461537.00
3Kanchili404531.244259.00 2045312.353718.00
4Sompeta2210250.269840.85 391045.381004.00
5Mandasa2211930.6211214.15 1172786.652557.00
6Palasa142161.692075.00 902104.671999.00
7Vajrapukotturu 3254.23244.00 1693688.043523.00
8Santhabommali3397.50374.00 1794772.854486.00
9Kotabommali252833.122606.00 3099471.008619.00
10Nandigam152024.901660.00 3869460.527663.00
11Tekkali81441.871240.00 2144873.954192.00
12Meliaputti226554.335374.06 1963850.203119.00
13Pathapatnam275357.704393.00 2335235.904293.00
14Saravakota245324.094685.00 3257431.186435.00
15Hiramandalam191862.021527.00 1432822.302286.00
16Kotturu828247.797341.00 3046738.424852.00
17Bhamini746652.465721.00 1824506.71858.00
18Seethampeta5891.67731.41 1752667.112160.00
19Palakonda42932.592874.00 34679.89659.00
20Burja1238632.828546.22 1693278.833213.00
21Santhakavity235649.725593.00 2496061.335940.00
22Rajam545403.575187.00 2775865.885631.00
23Regidi298655.678309.00 4516787.356448.00
24Vangara61727.221178.00 2183826.723635.00
25Veeraghattam1309.46300.00 891439.891382.00
26L.N.Peta203385.592945.00 1485048.204392.00
27G.Sigadam937281.045534.00 2273672.352754.00
28Etcherla5728.59306.00 1051935.65794.00
29Laveru655447.622258.00 2184215.031728.00
30Ranasthalam462936.241263.00 3145457.582339.00
31Ponduru131092.33393.00 1212420.20861.00
32Polaki -- -- -- 1322988.032928.00
33Narasannapeta -- -- -- 852451.032402.00
34Gara4481.39472.00 711214.951191.00
35Srikakulam91179.671144.00 1393436.723368.00
36Amadalavalasa41096.46877.00 2284412.583530.00
37Sarubujjili233964.963410.00 672162.231860.00
38Jalumuru81088.341067.00 982628.882576.00
TOTAL960140930122662 6937151531122710
Statement Showing The Particulars Under Minor Irrigation (M.I. Tanks/ Sources & Schemes)
S.No Constituency Name of the Mandal M.I. Sources/ Schemes P.R.Tanks TOTAL
Nos Ayacut in Acres   Nos Ayacut in Acres Nos Ayacut in Acres
1 Ichapuram Itchapuram 20 7462.76   129 2585.78 149 10002.76
2Kaviti5758.00 1032195.461082953.46
3Kanchili404531.24 2045312.352449843.59
4Sompeta2210250.26 391045.386111295.64
  8723002.26 47511138.9756234095.45
5PalasaMandasa2211930.62 1172786.6513914717.27
6Palasa142161.69 902104.671044266.36
7Vajrapukotturu 3254.23 1693688.041723942.27
  3914346.54 3768579.3641522925.90
8TekkaliSanthabommali3397.50 1794772.851825170.35
9Kotabommali252833.12 3099471.0033412304.12
10Nandigam152024.90 3869460.5240111485.42
11Tekkali81441.87 2144873.952226315.82
  516697.39 108828578.32113935275.71
12PathapatnamMeliaputti226554.33 1963850.2021810404.53
13Pathapatnam275357.70 2335235.9026010593.60
14Hiramandalam191862.02 1432822.301624684.32
15Kotturu828247.79 3046738.4238614986.21
16L.N.Peta203385.59 1485048.201688433.79
  17025407.43 102423695.02119449102.45
17PalakondaBhamini746652.46 1824506.7125611159.17
18Seethampeta5891.67 1752667.111803558.78
19Palakonda42932.59 34679.89383612.48
20Veeraghattam1309.46 891439.89901749.35
  8410786.18 4809293.6056420079.78
21RajamSanthakavity235649.72 2496061.3327211711.05
22Rajam545403.57 2775865.8833111269.45
23Regidi298655.67 4516787.3548015443.02
24Vangara61727.22 2183826.722245553.94
   11221436.18 119522541.28130743977.46
25EtcherlaG.Sigadam937281.04 2273672.3532010953.39
26Etcherla5728.59 1051935.651102664.24
27Laveru655447.62 2184215.032839662.65
28Ranasthalam462936.24 3145457.583608393.82
  20916393.49 86415280.61107331674.10
29Narasanna petaSaravakota245324.09 3257431.1834912755.27
30Polaki00 1322988.031322988.03
31Narasannapeta00 852451.03852451.03
32Jalumuru81088.34 982628.881063717.22
  326412.43 64015499.1267221911.55
33Amadala valasaBurja1238632.82 1693278.8329211911.65
34Ponduru131092.33 1212420.201343512.53
35Amadalavalasa41096.46 2284412.582325509.04
36Sarubujjili233964.96 672162.23906127.19
  16314786.57 58512273.8474827060.41
37SrikakulamGara4481.39 711214.95751696.34
38Srikakulam91179.67 1393436.721484616.39
  131661.06 104651.672236312.73
 TOTAL960140930 69371515317897292461.00
NOTE ON SPECIAL INVESTIGATION DIVISION, SRIKAKULAM

The Government have sanctioned an amount of Rs.310.00 Crs G.O.Ms.No.01, I&CAD, Date.03-01-2007 for formation of Nagavali & Vamsadhara flood banks and entrusted the Vamsadhara flood banks packages- I, II, III & IV to this division for execution.

Name of the Agency :-

Vamsadhara Pkg -I, II & III : M/s Ramky Infrastructure Ltd, Hyd

Vamsadhara Pkg -IV : M/s. A.P.R. Construction, Hyderabad.

The details of works and its present status as follows:-

Major Irrigation Sector:-

1) Vamsadhara Package-I:- Formation of Flood Bank on Vamsadhara River on right margin from Bathili (V) to Keesari (V) of Bhamini (M) and Sirusuvada to Akulatampara (V) of Kotturu (M) in Srikakulam Dist. SE's Agt. No.5SE/2007-08, Dt.20.06.2007 for Rs.4477.00 Lakhs @ 15.30% Less than ECV. 9.42% of work completed and stopped since 06/2010. The Expenditure incurred sofar is Rs. 385.29 Lakhs as on 02/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 460.68 Acres, Land Acquired 82.40 Acres, Land to be acquired 378.08 Acres.

2) Vamsadhara Package-II:- Formation of Flood Bank on Vamsadhara River Left margin from Rugada to Karakavalasa (V) and Right margin from Gulumuru (V) to Scotpeta (V) of L.N.Peta (M) of Srikakulam Dist. SE's Agt. No.06SE/2007-08, Dt.20.06.2007 for Rs. 2729.00 Lakhs @ 15.311% Less than ECV. 3.76% of work completed and stopped since 03/2011. The Expenditure incurred sofar is Rs. 93.71 Lakhs as on 08/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 229 Acres, Land Acquired 32.12 Acres, Land to be acquired 196.88 Acres.

3) Vamsadhara Package-III:- Formation of Flood Bank on Vamsadhara river right margin from Scotpeta in L.N. Peta (M) to Sevakulapeta (V) of Amudalavalasa (M) and Navanambadu (V) in Srikakulam (M) to Kalingapatnam (V) in Gara (M) of Srikakulam Dist. SE's Agt. No.07SE/ 2007-08, Dt.20.06.2007 for Rs.4916.00 Lakhs @ 20.09% Less than ECV. 2.45% of work completed and stopped since 07/2010. The Expenditure incurred sofar is Rs.104.88 Lakhs as on 02/2011.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 353 Acres, Land Acquired 167.94 Acres, Land to be acquired 185.06 Acres.

Present status:-

Vamsadhara packages-I,II & III:-

M/s Ramky Infrastructure Ltd, Hyderabad have represented to the government to pre-closure of EPC Agreements and proposals submitted to government Vide Chief Engineer, North Coast, Visakhapatnam letter No.CE/ NC/ VSP/ DEE1/ AEE5/ NCFB/Vol.12/ Dt.10.04.2013. (Package-I) & CE/ NC/ VSP/ DEE1/ AEE5/ NCFB/ Vol.13/1/ Dt.24.12.2013 & (Package-II & III)for taking further necessary action.

Final notice issued to the agencies to resume the balance works vide letter Nos.183-M, 184-M & 185-M/Dt.19.04.2015, 263-M, 264-M & 265-M/Dt.27.05.2015 and 280-M, 281-M &282-M/ Dt.02.06.2015for resuming the balance works in accordance with the G.O.Ms.No.22/ Dt.23.02.2015 and as per instructions of the Principal Secretary to Government, Water Resources (Reforms) Dept., Hyderabad vide Memo No.3810/Reforms/ A1/ 2015-2/ Dt.04.04.2015. But, agencies were not resumed the balance works till to day and report submitted to the higher authorities for taking further necessary action. Action will be initiated to re-call the tenders as per instructions of the higher authorities. The EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbili vide this office Lr.No.306-SE, 307-SE & 308-SE/Dt.19.06.2015 for approval.

4) Vamsadhara Package-IV:- Formation of Flood Bank on Vamsadhara river left margin from Karakavalasa (V) of Jalumuru (M) to Pallipeta (V) of Polaki (M) in Srikakulam Dist. SE's Agt. No.38SE/2009-10 for Rs.5660.01@ 4.5691% Excess over ECV. 14.2% of work completed. At present the work is in progress. 6th EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbili vide letter No.305-SE/Dt.19.06.2015 for accorded approval from the Government. The Expenditure incurred sofar is Rs.789.27 Lakhs.

The EOT proposals upto 31.07.2015 were submitted to the Superintending Engineer, Irrigation Circle, Bobbili vide this office Lr.No.305-SE/Dt.19.06.2015 for approval.

Land Acquisition:- Proposals sent to SDC, Srikakulam - 381.88 Acres, Land Acquired 90.15 Acres, Land to be acquired 291.73 Acres.

Linking of Nagavali left main canal from Korukonda Distributory to voni gedda canal & improvements to Voni gedda canal for supplementation to the 7000 Acres ayacut under existing Vonigedda canal system

Administrative approval: Administrative approval was accorded by the Government vide G.O.Rt.No.286/ I&CAD/PW-M&MI A1(2) Department/ Dt.09.05.2013 for Rs.699.90 Lakhs.

Technical Sanction: Technical sanction was accorded by the Chief Engineer, North coast, Visakhapatnam for Rs.699.90 Lakhs vide CE(I) No.06/2013-14/ Dt.23.05.2013.

Agreement: The work was entrusted to M/s Harsha Constructions, Hyderabad vide Superintending Engineer, Irrigation Circle, Bobbili Agmt. No.06SE/2013-14/ Dt.12.02.2014 for Rs.538.11 Lakhs @ 12.34% Less than the ECV of Rs.6,13,86,760/- with an agreement period of 12 months. EOT granted upto 29.02.2016.

Land Acquisition: The LP Schedules for an extent of 4.849 Acres of land were submitted to the Joint Collector, Srikakulam vide letter No.5R/Dt.06.02.2015.

Expenditure Incurred sofar: Rs.297.22 Lakhs.

Present Stage: At present the work is in progress.

HUD-HUD Cyclone - Major & Minor Irrigation October-2014: (G.O.Rt.No.727/Dt.10.11.2014.)

Administrative approval was accorded by the District Collector, Srikakulam vide proceedings No.2495/2014/D.3/Dt.10.01.2015 to take up 5 Nos. of Permanent Restoration for Rs.29.70 Lakhs. 3 works completed and balance 2 works are in progress.

Neeru-Chettu Programe:

Administrative approval was accorded by the District Collector, Srikakulam to take up 417 Nos. of De-silting & Improvements works to the MI.Tanks, Open head channels, Gedda systems, and Removal of Encroachments in foreshore areas to the MI.Tanks, De-silting & Improvement works to the Main & Branch channels of NLS system under Major Irrigation Sector having an ayacut of more than 100 Acres and less than 100 Acres (PR tanks) for Rs.2927.10 Lakhs. 100 works completed and balance works are in progress out of 164 works takenup. The Expenditure incurred under these works is Rs.503.10 Lakhs.

Minor Irrigation Schemes:
S.No Name of the work Estimate Value/ Ayacut Sanction No. Agrt.No/Value & Name of the agency Exp. Incurred sofar Present stage
1 Formation of New M.I. tank across Raikhillogedda near Devupuram (V) Mandasa (M) of Palasa Assembly constituency O.E - Rs.214.84 Lakhs R.E - Rs.436.86 Lakhs 860 Acres G.O.Ms.No.60/ I&CAD Dept./ Dt.31.03.2003 vide CE(I) No.256/ 2003-04/ Dt.01.08.2003. 14-SE/2003-04 Rs.156.51 Lakhs M/s. Venkata Ponduranga Const., VSP Rs. 325.59 Lakhs Head works completed. The Revised Estimate proposals for the balance works with SSR 2014-15 were submitted to the CE/MI/HYD vide SE/IC/Bobbili Lr.No.667CE/ Dt.21.11.2014 for Rs.436.86 Lakhs for obtaining Revised administrative approval from the Govt.
2 Formation of Reservoir across Kadagandi gedda near Jambada (V) L.N.Peta (M) of Pathapatnam Assembly constituency O.E- Rs.195.16 Lakhs R.E. Rs.406.00 Lakhs 580 Acres G.O.Ms.No.100/ I&CAD Dept. /Dt.20.09.2004 CE(I) No.316/ 2004-05/ Dt.29.12.2004 02SE/2005-06/ Dt.19.04.2005 Rs.105.56 Lakhs M/s B.Prabhakara Reddy, Hyd. Rs. 175.72 Lakhs Head works completed. The balance works i.e., Surplus course, Canals, CM&CD works etc., were stopped by the contractor due to Land acqusition problem. The Revised Estimate Proposals for the balance works with SSR 2014-15 submitted to the Government by the CE,MI, A.P., Hyderabad for Rs.406.00 Lakhs for according Revised administrative approval.
3 Formation of Reservoir across Kondaloya gedda near Bhamini (V) &(M) of Palakonda Assembly constituency. O.E. Rs.377.00 Lakhs R.E. Rs.890.00 Lakhs 988Acres G.O.Rt.I&CAD(MI) No.17/ Dt.28.01.2006. CE(I) No.18/ 2006-07/ Dt.04.05.2006. 36SE/2006-07/ Dt.29.03.2007 Rs.307.45 Lakhs M/s Ratna Constructions, Hyderabad Rs. 162.55 Lakhs 40% of work completed and stopped by the agency since 09/2012 and not submitted the further EOT proposals for completion of the work even after issuing several notices. The Revised Estimate proposals for the leftover quantites were submitted with SSR 2014-15 to the CE/MI/HYD vide SE's Lr.No.152-CE/ Dt.20.03.2015 for Rs.890.00 Lakhs for obtaining Revised administrative approval from the Govt. and for issuing instructions to determine the contract.
4 Conversion of Gangasagaram tank into Mini Reservoir near Jalantrakota (V) Kanchili (M) of Itchapuram Assembly constituency O.E-Rs.611.00 Lakhs R.E- Rs.766.40 Lakhs 845 Acres G.O.Rt.No.1084/I&CAD (MI-1)/ Dt.26.06.09 CE(I) No.131&132/ 2009-10 /Dt.19.01.2010 (578.60 (W) + 32.40 (L.A.) 13SE/2010-11/ Dt.01.06.2010. Rs.418.82 Lakhs M/s R.Subba Raju, Contractor, Tilak Nagar, Rajahmundry Rs. 180.78 Lakhs Contractor has completed 46.72% as on 05/2011 and stopped due to non-handing over of the required land and other bottlenecks such as shifting of eletrical lines etc. Report submitted to CE,MI,HYD vide SE's Lr. No.203-CE/ Dt.16.04.2015. Revised Estimate proposals submitted to the SE/IC/Bobbili vide this office letter No.293-SE/ Dt.04.06.2015 and returned the same by the SE.,I.C., BBL vide Memo.No.129-SI/Dt.25.06.2015. The contract for the above work was closed by the Govt. vide Memo.No.9618/Dt.01.07.2015.
Mandal wise abstract of M.I. Tanks - Ayacut Irrigated during khariff 2014 in respect of SMI division, Seethampeta
S.NoMandalNo. of M.I. tanksAyacut ( in Acres)Ayacut irrigated 2014
1Seethampeta10733952988
2Palakonda410189
3Veeraghattam29885788
4Bhamini22869791
5Burja12435413
6Sarubujjili7295274
7Kotturu30792729
8L.N.Peta5201191
9Hiramandalam321065990
10Pathapatnam31893839
11Meliaputti9326772329
12Saravakota36970825
13Jalumuru38568
14Tekkali20608517
15Nandigam22727582
16Palasa23552497
17Mandasa5315901415
18Sompeta7185163
19Kanchili10391332
5461671614819
Mandal Wise Abstract Of Ayacut Partiulars of SMI Division, Seethampeta
S.NoMandalNo. of M.I. tanksAyacut ( in Acres)No. of Check damsAyacut (in Acres)Total(MI Tanks & Check dams)Total(Ayacut in Acres)
1Seethampeta1073395273789738011292
2Palakonda410141558256
3Veeraghattam2988511295401180
4Bhamini2286915571371440
5Burja12435718519620
6Sarubujjili7295819715492
7Kotturu3079212316421108
8L.N.Peta5201720812409
9Hiramandalam32106532864641929
10Pathapatnam3189327677581570
11Meliaputti9326774611611393838
12Saravakota3697012317481287
13Jalumuru3851224107
14Tekkali20608820728815
15Nandigam22727616528892
16Palasa235521122834780
17Mandasa53159016581692171
18Sompeta718549111276
19Kanchili1039139113482
5461671650314228104930944
A.P.S.I.D.C.- Srikakulam District Details Of Commissioned Lift Irrigation Schemes - Assembly Constituency wise.
Sl. NoName of the SchemeSourceMandalEnvisaged Ayacut in AcresEst. cost (Rs.in lakhs)Date of CommissioningPresent stage Proposed under
123456789
A) TEKKALI Constituency:
1Sripuram VLMCKotabommali60093.47Nov.2006Working -
2Kurudu VLMC - do -1650225.12Sep.07 - do - -
3Pedabammidi BC of VLMC - do -1000429.15Sep.2012 - do - -
4Nimmada local pond - do -503.50July.03 - do - -
5PodugupaduVLMC - do -1000840.39July, 2013 - do - -
6Narayanavalasa VLMC - do -1500175.51Sep.02Partially workingRevival Works under progress
7KothapetaVLMC - do -800838.29Oct.14Working -
Sub-total:-66002605.43
B) NARASANNAPETA Constituency:
1Lingalavalasa VLMCJalumuru1500376.48July.10Working -
2Jalumuru VLMC - do -500140.05July.10 - do - -
3Ramachandrapuram VLMC - do -1300330.05July.10 - do - -
4TekkalipaduN'peta B.C. of VLMCJalumuru1250766.53Oct.14 - do - -
5Bhadri VLMCSaravakota600149.88July.10 - do - -
6Thogiri VLMC - do -1000637.50Sep.11 - do - -
7Cheedipudi VLMC - do -45020.35Jun-94 - do -Revival Works under progress
8Odipadu BC.of VLMCPolaki5011.00Oct.07 - do - -
9Geddayyapeta BC.of VLMCNarasannapeta9049.04July.11 - do - -
10Bydalapuram VLMC - do -40012.31Oct-91Partially workingRevival Works under progress
Sub-total:-71402493.19
C) ITCHAPURAM Constituency:
1Pothangi MahendratanayaSompeta20068.89Aug.2011Working -
2Kuthuma Beela (swamp)Kanchili25063.70Sep.11Working -
3Benkili - do - - do -20011.32Sep-95Not working. Fit for RevivalRevival Works under progress
4Rushikudda - do - - do -30011.01Nov-93 - do - - do -
5Edupuram BahudaItchapuram1200127.37Nov.03 - do - - do -
Sub-total:-2150282.29
D) PALAKONDA Constituency:
1Mukundapuram PeddageddaSeethampeta19062.12Aug.2011WorkingTSP
2Addakulaguda Isukagedda - do -1204.11Apr-85Partially workingRevival Works under progress
5Kuddapali - do - - do -7511.91Jul-00 - do - - do -
3Manda Kambagedda - do -2005.92Nov-87 - do - - do -
4Engupeta Cheepurugedda - do -1006.29Jun-92 - do - - do -
6Neradi VamsadharaBhamini50013.85Dec-92Not working. Fit for Revival - do -
7Chinamangalapuram NagavaliPalakonda2003.28Sep-88 - do - - do -
8ManapuramRellagedda - do -1006.58Apr-92Abandoned. Ayacut covered under Check Dam. -
9Kothakota - do - - do -1006.70Jun-92  -
10Liviri Vamsadhara - do -1005.00June.02Abandoned. Total schemes washed away in floods. -
11Pasukudi - do - - do -1009.00Sep.02  -
Sub-total:-1785134.76 - -
E) RAJAM Constituency:
1Geethanapalli SuvarnamukhiVangara804.00Aug.09Working -
2Kinjangi Vegavathi - do -4503.43Jun-05Not working. Fit for RevivalRevival Works under progress
3Voni Nagavali - do -30012.07Oct-93Abandoned. Ayacut covered under other source -
4Regidi Amadalavalasa - do -Regidi65032.07Aug-97  -
Sub-total:-148051.57
F) AMADALAVALASA Constituency:
1Laxminarasupeta VamsadharaL.N.Peta50011.30May-95Working -
2Naira Agriculture College,IFW's - do - - do -20039.00July.2002 working. -
Sub-total:-70050.30sub-total
G) PATHAPATNAM Constituency:
1KittalapaduVLMCHiramandalam600439.00Aug.2012Working -
2RugadaVamsadhara - do -900502.30Sep.2012 - do --
3Makanapalli MahendratanayaMeliaputti20029.62Dec.2005 - do - -
4Peddapadmapuram - do - - do -35025.60Aug-94Not working. Fit for RevivalTo be sanctioned
5Pathapatnam - do -Pathapatnam25010.00Jul-99Not working. Fit for RevivalRevival Works taken up
Sub-total:-23001006.52
H) SRIKAKULAM Constituency:
1PonnamVamsadharaSrikakulam50025.00Jun-94Abandoned. Ayacut covered under other source -
2Ronanki - do - - do -120060.00Jul-99  -
Sub-total:-170085.00
45 GRAND TOTAL238556709.06
A.P.S.I.D.C.Division, Srikakulam. Srikakulam District - Mandal Wise Ayacut Details Under Lift Irrigtion Scheme
S.No.ConstituencyMandalNo. oF L.I.S'sAyacut in Acres
1TekkaliKotabommali76600
2NarasannapetaJalumuru44550
Saravakota32050
Narasannapeta2490
Polaki150
3ItchapuramSompeta1200
Kanchili3750
Itchapuram11200
4PalakondaSeethampeta5685
Palakonda5600
Bhamini1500
4RajamVangara3830
Regidi1650
5AmadalavalasaL.N.Peta1500
6PathapatnamHiramandalam21500
Meliaputti2550
Pathapatnam1250
8SrikakulamSrikakulam21700
TOTAL :-4523655
Status of Budget & Expendiutre for the years 2013-14, 2014-15 & 2015 -16 inrespect of Chief Engineer, North Coast, Visakhapatnam
S.No Name of The ProejctName of Component Budget 2014-15Expenditure Incurred 2014-15Budget 2015-16Expenditure Incurred Upto 31.08.2015Funds Available
1MH : 106 Vamsadhara Project Stage -IWorks 1895.691194.021780.00677.561102.44
  Lands10.00 --20.00020.00
  Total :-1905.691194.021800.00677.561122.44
2MH : 131 Neradi Barrage Vamsadhara Stage-IIWorks 488.00166.073000.00138.242861.76
  Lands301.0063.672501.00137.382363.62
  R&R1494.271385.04779.00726.4152.59
  Buildings10.00 --20.00020.00
  Total :-2293.271614.986300.001002.035297.97
3MH: 143 Madduvalasa Project Works 304.99172.01300.9673.62227.34
  Lands250.007.12199.0067.55131.45
  R&R0.04 --0.0400.04
  Total :-555.03179.13500.00141.17358.83
4MH: 245 Mahendratanaya River Flood Flow Canal Works398.70188.65399.000399.00
  Lands600.00387.57150.00339.02-189.02
  R&R101.00 --51.00051.00
  Total :-1099.70576.22600.00339.02260.98
NON - PLAN
5MH: 115 Vamsadhara Stage-I Works90.001.7560.0010.0849.92
  Total :-90.001.7560.0010.0849.92
6MH: 129 Neradi Barrage Vamsadhara Stage-II Works20.004.046.000.395.61
  Total :-20.004.046.000.395.61