Upperpennar Project is a medium irrigation project constructed during 1959 across Pennar River at Perur (V), Ramagiri (M), Ananthapur District to irrigation 10,052 acres benefiting 14 Villages in four Mandals of Anantapur District Viz., Ramagiri Kanaganapalli ,Kambadur and Rapthadu.. The Left canal runs for length of 5.78 kms serving an ayacut of 580 acres in 15 villages and the Right Main Canal runs for a length of 24.60 kms serving an ayacut of 9,472 acres. The Gross storage capacity of the Reservoir is 1810Mcft(51.28 Mcum) and the Live storage is 1573 Mcft (44.57 Mcum)
The project is posed for modernization under JICA phase-II with a cost of Rs 12.00 Crores. The estimates were prepared and submitted to the JICA for according approval. However due to distress in JAPAN, JICA expressed its inability for assistance.
Location | : | The project is constructed across Pennar river near Near Perur (V), Ramagiri (M), Ana thapur District. |
Basin | : | pennar |
Longitude | : | 78° 10' 59'' |
Latitude | : | 13° 05' 40'' |
Distance from Village/Town | : | 55KM from Dharmavaram town, 400 Km from Hyderabad |
Catchment area in Sq Km | : | 5245 |
Capacity | : | 1811 Mcft |
Utilization | : | 1574 Mcft |
Ayacut | : | 10,048 acres |
Under Left Main Canal:5.76 Km | : | 580 acres |
Vent Size & Nos: | : | -- |
Sill level | : | 529.44 m |
Discharge in cumecs | : | 12.83 cusecs (0.36 cumecs) |
Under Right Main Canal: 24.6 Km | : | 9472 acres |
Vent Size & Nos: | : | -- |
Sill level | : | 529.44 m |
Discharge in cumecs | : | 245 Cusecs (6.93 cumecs) |
Maximum Flood Discharge | : | 1,20,000 cusecs |
Spillway Details: | ||
Type, Size &Nos | : | Gated-Vertical,12.19 m x 4.57 m & 8 526.39 Mts.+539.80 m |
Crest Level | : | +536.44 m |
Spillway discharge | : | 3398 Cumecs |
Spillway discharging length | : | 129.23 m |
Earth dam length | : | 3505.19 m |
Deepest bed level | : | 522.12 Mts. |
Mandals benefited | : | Ramagiri, Kanaganipalli,Kambadur, Rapthadu &Anantapur |
Assembly Constituency | : | Kalyandurg |
Parliament Constituency | : | Ananthapur |
Source of Funding | : | The estimated cost of the project is 1.60 crores |
Budget Estimate 2010-11 | : | Rs. 60.00 Lakhs |
Index Map