TADIPUDI LIFT IRRIGATION SCHEME
Preamble
The Government of Andhra Pradesh have accorded Administrative Approval for Rs. 23,740 lakhs. The scheme is contemplated to provide irrigation facilities to 14 mandals of West Godavari district. The scheme also provides drinking water facilities to 5.40 lakh population enroute the canal system. The lifting of water is proposed on Godavari at km 26.2 of Akhanda Godavari right bank.
Salient Features
Location |
: |
On River Godavari near Tadipudi (V) Tallapudi (M),W.G.Dist |
Ayacut |
: |
2, 06,600Acres |
No of Villages benefited |
: |
135 No.s |
No of Mandals benefited |
: |
14 No.s |
Villages benefitted |
: |
56 nos |
Mandals benefitted |
: |
7 nos |
Water Utilisation |
: |
14.470TMC |
Crops |
: |
Khariff Only |
Drinking water |
: |
5.40 Lakh population enroute the canal |
Power required |
: |
28 M.W |
Discharge |
: |
1396 Cusecs |
Static load |
: |
30.03 M |
Pumps |
: |
Vertical turbine pumps |
Capacity |
: |
24,000 H.P (8No.s 3000 HP each) |
Ayacut Created |
: |
14500 Acres |
Length of Pressure main |
: |
2.59 KM (1635 MM Ø Pipes of 12 rows) |
Length of main canal |
: |
80.45 KM |
Length of distributories |
: |
675 KM |
Present Stage |
: |
ongoing |
Chintalapudi Lift Irrigation Scheme
Name of the Scheme |
: |
Chintalapudi Lift Irrigation Scheme |
Cost of the Project |
: |
Rs.1701.00 Crores G.O.Ms.No.240
dt:24.10.2008
|
Location of Pump Houses |
: |
1st Stage |
: |
@ Km.26.500 of AGRB Near Tadipudi |
2nd Stage |
: |
@ Kovvurupadu. |
3rd Stage |
: |
@ Jalleru Reservoir. |
Static Head |
: |
1st Stage |
: |
30.52 M |
2nd Stage |
: |
82.65 M |
3rd Stage |
: |
24.65 M |
Power Required |
: |
111 MW |
Discharge required |
: |
56.00 cumecs |
Ayacut proposed |
: |
1,78,000 Acres. |
No. of villages benefited |
: |
253 |
Pressure Main |
: |
1st Stage |
: |
4 Rows of MS Pipes of 3.00 m dia |
2nd Stage |
: |
4 Rows of MS Pipes of 3.00 m dia |
3rd Stage |
: |
2 Rows of MS Pipes of 3.00 m dia |
Length of Pressure Main |
: |
1st Stage |
: |
3.00 Kms |
2nd Stage |
: |
3.00 Kms |
3rd Stage |
: |
1.40 Kms |
Length of Main Canal |
: |
|
Package 1 |
: |
Km.0.00 to Km.36.00 |
Package 2 |
: |
Km.36.00 to Km.68.00 |
Canal section |
: |
|
Bed width |
: |
24 Mt. |
FSD |
: |
3.2M |
Length of Leading Channel |
: |
13.20 Kms. |
Completed Ayacut |
: |
181460 Acres |
Reservoir capacity |
: |
8 TMC. |
Mandal benefited |
: |
West Godavari District 12 |
: |
Krishna District 03 |
Present Stage |
: |
ongoing |