LOWER SAGILERU PROJECT

Background and Preamble.

Lower Sagileru Project is a Medium Irrigation Project Constructed across the river Sagileru which is a tributary to Pennar River. The Project site is located at Vaddamanu village in B.Kodur Mandal of Kadapa District. The Project was taken up for execution on 01-11-1954 and completed on 02-07-1959 in the 1st five year plan. The localized ayacut is 10,924 acres i.e., 8320 acres are being irrigated and the balance 2604 acres are developed as gap ayacut. Telugu Ganga Project water is proposed to be released to L.S.P. system in the ensuing Khariff season, and to ensure the assured water supply to the regularized ayacut and to fill the gap ayacut under this Scheme.

Salient Features
Location : 25 km from Rajampet and 460km from Hyderabad
Longitude : 79°01'15"
Latitude : 14°12'06"
Capacity : 7.30 Mcum
Ayacut : 10924 acres
Under Left Main Canal : 10924 acres
Length of the Canal : 22 km
Vent Size & Nos: : 1no, 1.68mx1.22m
Sill level : +153.62m
Discharge in cumecs : 5.66 cumecs
Under Right Main Canal : 2224 acres
Length of the Canal : 12.50 km
Vent Size & Nos: : 1 no, 0.91mx2.28m
Sill level : +155.75m
Discharge in cumecs : 2.83 cumecs
Catchment Area : 1796.42 Sq.km
Maximum Flood Discharge : 1586 cumecs
Spillway Details:
Type, Size &Nos : Ogee spillway with Vertical gates of size 12.19mx5.48m, 5nos
Crest Level : +151.49 m
TBL : +158.95m
FRL / MWL : +156.97m / +156.97m
Utilization : 600Mcft
Mandals benefited : 2 Mandals viz., B.Kodur,Badvel and B.Mattam 1. Badvel 2. Gorlakunta 3. Nagula cheruvu 4. Chennampalli 5. Rajupalem 6. B.Kodur 7. Mekavaripalli 8. Munnelli 9. Thangedupalli 10. Ammavaripeta 11. Guntapalli 12. Rajupalem 13 .Mannuru 14. Kothakunta 15. B.Mattam 16. Venkatapuram 17.Gundapuram 18. Palugurallapalli
Components:
Earth Dam- Length of Dam -- 1925 m
Spillway-Length of spillway -- 70.71m
Head Sluice
Main Canals -- LMC, RMC
Present Status of Works : Modernisation work is under progress
Source of Funding : NABARD RIDF-II and JICA Loan assistance
Land Aquisistion : Nil
Budget and Expenditure
Budget for 2011-12 : Rs.50.00 Lakhs.
Expenditure : (up to 3/ 2011) : Rs.50.00 Lakhs.
Program for 2011-2012 : Modernisation work is under progress