BUGGAVANKA PROJECT

Background & Preamble

Buggavanka Project was constructed across Buggavanka River near Ippapenta (V), C.K.Dinne (M) of Kadapa District. Buggavanka Project is a Medium Irrigation project completed by 2000 with a storage capacity of 0.50TMC.The contemplated ayacut under this project is 9700 acres in Khariff and 3150 acres in Rabi. The project is located 10km North of Kadapa town. The cost of the Project is Rs.38 Crores (SSR of 2000-2001) and the updated cost including improvements and modernization is Rs.39 Crores (SSR of 2002-2003).

A sink hole was formed on 11-12-05 at Ch 1505m on right flank and Ch 870m on left flank where water level in the reservoir is +184.15M.Government have accorded administrative approval for the treatment of sink hole portion for Providing grout curtain for the treatment to sink hole location at Ch 870M of LF and Ch 1505M of RF including sand sluicing of BVP earth dam for Rs. 210.60 lakhs. Technical sanction was accorded for Rs. 214.80 Lakhs vide CE(I) No. 19/2010-11, Dt: 06.11.2010.Tenders have been called for and the agency is fixed. The work will be ground shortly.

Salient Features
Location : 10 km from Kadapa and 420km from Hyderabad
Longitude : 78° 50' 15"
Latitude : 14° 23' 51"
Capacity : 14.32 M cum
Ayacut : 12850 acres
Under Left Main Canal : 10245 acres
Length of the Canal : 16.63 km
Vent Size & Nos: : 1.20x1.50m, 1no
Sill level : +174.50m
Discharge in cumecs : 2.33 Cumecs
Under Right Main Canal : 2605 acres
Length of the Canal : 4.86 km
Vent Size & Nos: : 0.70mx0.90m, 1 no
Sill level : +174.50m
Discharge in cumecs : 0.69 Cumecs
Catchment Area : 205.79 Sq.km
Maximum Flood Discharge : 929 Cumecs
Spillway Details:
Type, Size &Nos : Ogee spillway, Radial gates, 12m x 6m, 4nos
Crest Level : +186.00 m
TBL : +189.00m
FRL / MWL : +186.00m / +186.00m
Utilization : 974 Mcft
Mandals benefited : 12 Villages in C.K Dinne and 2 Villages in Kadapa. 1.Ippapenta 2. Buggalapalli 3. Rudraiahgaripalli 4. Jamalapalli 5. Pedda Kampalli 6. Chinna Kamapalli 7. C.K.Dinne 8. Kolumulapalli 9.Apparajupalli 10. Balupalli 11. Cherlopalli 12.Papasaheb pet 13. Utukur 14. Mamillapalli.
Components:
Gravity Dam- Length of Dam -- 1910 m
Spillway-Length of spillway -- 57.0 m
Head Regulators : 2No's
Main Canals -- LMC, RMC
Present Status of Works : The work for providing grout curtain for the treatment to sink hole location at Ch 870M of LF and Ch 1505M of RF including sand sluicing of BVP earth dam is to be grounded shortly.
Source of Funding : State Plan, NABARD
Land Aquisistion : Nil
Budget and Expenditure (2011-12 UPTO 03/2011)
Budget for 2011-12 : Rs. 250.00 Lakhs
Expenditure : (up to 3/ 2011) : Rs.3.34 Lakhs.
Program for 2011-2012 : The work for providing grout curtain for the treatment to sink hole location at Ch 870M of LF and Ch 1505M of RF including sand sluicing of BVP earth dam is to be grounded shortly.