1. In accordance with the assurance given by the Hon'ble Chief Minister , a Major Lift Irrigation Scheme is conceived namely "BABU JAGJEEVANA RAM UTTARANDHRA SUJALA SRAVATHI".
2. The objectives of the project are
a) To provide irrigation facilities to 8.00 lakh acres in the upland areas of Visakhapatnam, Vizainagaram and Srikakulam Districts.
b) To provide Industrial and Drinking water facilities to 1200 villages covering a population of 30.00 Lakhs.
3. To provide Industrial and Drinking water facilities to 1200 villages covering a population of 30.00 Lakhs.
4. The proposed utilization of flood waters of River Godavari under the Project is 63.2 TMC
5. The water will be drawn from river Godavari at 230 cumecs for 90 days to meet the demand
6. The static lifts involved under the project are
1st Stage Lift near Purushothampatnam - 28 m
IInd Stage Lift near Papayyapalem - 45 m
IIIrd Stage (4 Nos) near the four Proposed reservoirs 45 m each - 45 m
7. Total storage contemplated in four reservoirs is 19.70 TMC
8. Total Power requirement for the Project is 339 MW
9. The ayacut proposed under the Project District wise is
Visakhapatnam ------ 3.21 Lakh Acres
Vizainagaram ------ 3.94 Lakh Acres
Srikakulam ------ 0.85 Lakh Acres
Total ------ 8.00 Lakh Acres
10. The total cost of the project is Rs. 7214.10 Crores
11. The project was administratively sanctioned vide G.O.Ms. No. 3 Dt. 2-1-2009 for Rs. 7214.10 Crores.
12. This project from the proposed command area ( Ayacut) of 8.0 Lakh Acres will produce 12.32 Lakh MTs gross of food Grains of value Rs. 2844.51 crores annually. The BENEFIT COST ratio of the project is worked out as 1.62:1.
Water Requirement:
The total water requirement of the Project comes to 63.2 TMC as follows.
1. Irrigation Requirement for 8.00 Lakh Acrs @ 1500 Acrs/TMC - 53.40 TMC
2.Drinking Water Requirement for 30 Lakh Population @ 110 Liters/capita - 4.46 TMC
3.Industrial Water Supply @ 1% of Irrigation Requirement. - 5.34 TMC
Total 63.20 TMC
Project Proposal :
The project contemplates lifting 230 cumecs of flood water from River Godavari for 90 days near Purushothapatnam (v) of East Godavari District and convey to Tallapalem (v) near Anakapalli by Gravity Canal of length 23 KM.
The water so conveyed will be further lifted to + 72.50M (over a static head of 45M) and run through a main canal of 106 km length finally dropping into existing Gadigedda Reservoir in Vizianagaram Dist.
The flood water will be stored in the following 4 Reservoirs by third stage lifting (over a static head of 45 m each) from main canal for supplying water throughout the crop season.
Reservoir | LIFT (3rd base) | Capacity |
---|---|---|
Pedapudi Reservoir near Ravikamatam | 45 m | 3.15 TMC |
Bhudevei Reservoir | 45 m | 6.55 TMC |
Veeranarayanapuram Reservoir near S. Kota | 45 m | 6.20 TMC |
Tatipudi extension Reservoir near S. Kota | 45 m | 3.80 TMC |
Total | 19.70 TMC |
The water will be supplied to the ayacut through net work of branch canals and distributory system duly providing sub lifts wherever necessary.
The total work of B.J.R Uttarandhra Sujala Sravanthi is devided into 6 Packages as follows :
Package No. | Name of Work | Total Amount (Crores) |
---|---|---|
I | Main Canal of 129 Kms, Structures | 2,177.39 |
II | Pedapudi Resevoir, Lifts, Branch Canals | 755.20 |
III | Bhudevi Reservoir, Lifts, Branch Canals | 884.95 |
IV | V.N. Puram Reservoir, Lifts, Branch Canals | 634.75 |
V | Thatipudi (Extension) Reservoir, Lifts, Branch Canals | 504.92 |
VI | Gadigedda (Improvements) Reservoir, Lifts, Branch Canals | 720.79 |
1. Name of the project | : | babu jagjivan ram Uttarandhra sujala Sravanti project | |
2. Cost of the project | : | Rs.7214.10 crores | |
3. Ayacut | : | ||
Vishakapatnam district | : | 3, 21,000 acres | |
Vizianagaram district | : | 3,94,000 acres | |
Srikakulam district | : | 85,000 acres | |
Total ayacut | : | 8,00,000 acres | |
4. Water requirement | |||
For 8.00 lakh acres ayacut | : | 53.40 tmc | |
For drinking water | : | 4.46 tmc | |
For industrial use | : | 5.84 tmc | |
Total | : | 63.20 tmc | |
5. Lifts | |||
i) purushothapatnam (ist stage) | : | 230 cumecs 28m lift | |
ii) jammathulapalem (iind stage) | : | 30 cumecs 50m lift | |
iii) TIDA(Near Pedapudi)(3rd stage) | : | 30 CUMECS 50M LIFT | |
iv) papayyapalem(iind stage) | : | 200 cumecs 50m lift | |
v) bhoodevi (iiird stage) | : | 30 cumecs 50m lift | |
vi) v.n.puram(iiird stage) | : | 30 cumecs 50m lift | |
vii) tadipudi extension(iiird stage) | : | 30 cumecs 50m lift | |
viii) kondagandredu (iiird stage) | : | 60 cumecs 50m lift | |
ix) g.marrivaladsa (iv sgtage) | : | 30 cumecs 50m lift | |
x) burjuvalasa (iv stage) | : | 15 cumecs 50m lift | |
6. Power requirement | : | 339mw | |
7. Reservoirs | |||
Name | : | FRL (m) | capacity (TMC) |
1) pedapudi reservoir | : | (+) 119.00 | 3.15 |
2) bhoodevi reservoir | : | (+) 118.00 | 6.55 |
3) vn puram reservoir | : | (+) 116.00 | 6.20 |
4) tadipudi extn. Reservoir | : | (+)114.40 | 3.80 |
5) gadigadda(existing) reservoir Proposed improvements | |||
Total | 19.70 TMC |
Sl No | Name of Mandal | Extent in Acres |
I | Visakhapatnam | |
1 | Chodavaram | 17,790 |
2 | Butchayyapeta | 28,010 |
3 | Ravikamatham | 21,992 |
4 | Madugula | 28,998 |
5 | Chidikada | 13,632 |
6 | Makavarapalem | 21,617 |
7 | Kotavuratla | 8,280 |
8 | Rolugunta | 32,188 |
9 | Narsipatnam | 40,100 |
10 | Kasimkota | 6,998 |
11 | Anakapalli | 7,050 |
12 | Sabbavaram | 12,769 |
13 | Pendurthi | 5,924 |
14 | Bhimunipatnam | 11,499 |
15 | Anandapuram | 15,582 |
16 | Devarapalli | 14,251 |
17 | Kotapadu | 19,661 |
18 | Padmanabham | 14,659 |
Total | 3,21,000 | |
II | Vizainagaram | |
1 | Vizainagaram | 21,857 |
2 | Kothavalasa | 6,610 |
3 | L. Kota | 11,077 |
4 | S. Kota | 15,583 |
5 | Gantyada | 16,335 |
6 | Jami | 24,212 |
7 | Vepada | 10,086 |
8 | Bhogapuram | 7,544 |
9 | Denkada | 7,569 |
10 | Pusapatirega | 6,516 |
11 | Nellimarla | 8,090 |
12 | Gurla | 26,584 |
13 | Garividi | 29,363 |
14 | Cheepurupalli | 23,243 |
15 | Meraka Mudidam | 32,609 |
16 | Gajapathinagaram | 20,558 |
17 | Bondapalli | 26,747 |
18 | Mentada | 9,662 |
19 | Datti Rajeru | 29,407 |
20 | Terlam | 8,704 |
21 | Ramabhardapuram | 23,519 |
22 | Badangi | 8,867 |
23 | Baligipeta | 12,125 |
24 | Bobbili (Part) | 7,133 |
Total | 3,94,000 | |
III | Srikakulam | |
1 | Rajam | 4,707 |
2 | Santha Kavati | 15,019 |
3 | Burja | 17,101 |
4 | Laveru | 23,264 |
5 | Etcherla (Part) | 4,603 |
6 | Ponduru | 20,306 |
Total | 85,000 |
Sl No | Name of District | Extent in Acres | Drinking water facility | Industrial water @ 10% |
1 | Visakhapatnam | 3,21,000 | 520 (V) | 4.74 TMC |
2 | Vizianagaram | 3,94,000 | 795 (V) | |
3 | Srikakulam | 85,000 | 232 (V) | |
Total | 8,00,000 | 1547 (V) (-) 347 (V) | ||
or 1200 (V) @ 2500 Pop./Village @ 110 Lts./day 4.46 TMC |