SANJEEVAIAH SAGAR (GAJULADINNE) PROJECT

Background and Preamble.

This project renamed as Sanjeevaiah Sagar is a Medium Irrigation Project constructed across Handri river a tributary to Tungabhadra in Krishna basin near Gajuladinne village in Gonegandla mandal of Kurnool District. The project provides irrigation facilities to 24,372 acres of I.D. Crop in rabi season covering 21 villages in 4 Mandals of Kurnool District viz., Gonegandla (9 No.), Kodumur (5 Nos.), Krishnagiri (6 Nos.) and Devankonda (1 No.).

Hence Modernization of the project is taken up with JICA Loan Assistance at a cost of Rs.46.31 crores. The agency has been fixed on 8-6-2011 with concurrence of JICA.The proposed modernization covers strengthening of the earthen bund, repairs of left head regulator and right side head regulator and mechanical works for spillway and head sluices, lining of both right and left side canals

Salient Features
Location : 20 km from Rajampet and 450km from Hyderabad
Basin : Krishna
Longitude : 78° 38'50"
Latitude : 15° 58' 00"
Capacity : 148.66 Mcum
Ayacut : 24372 acres
Under Left Main Canal : 3565 acres
Length of Canal : 26.50 km
Vent Size & Nos: : 1no, 1.2mx1.2m
Sill level : +367.50 m
Discharge in cumecs : 4.861 cumecs
Under Right Main Canal: 13.8 Km : 21775 acres
Length of Canal : 36 km
Vent Size & Nos: : 1.2mx1.2m 1no
Sill level : +367.20 m
Discharge in cumecs : 9.00 cumecs
Catchment area in Sq Km : 1274 sq.km
Maximum Flood Discharge : 2265 cumecs
Spillway Details:
Type, Size &Nos : Ogee spillway with Vertical gates of size, 12mx7.35m, 6nos
Crest Level : +371.00 m
TBL : +379.50 m
FRL : +377.00m / +378.00m
Utilization : 2000 Mcft
Mandals benefited : 21 villages in 4 Mandals of Kurnool District viz., Gonegandla (9 No.), Kodumur (5 Nos.), Krishnagiri (6 Nos.) and Devankonda (1 No.).
Components:
Earth Dam- Length of Dam -- 1910 m
Spillway-Length of Spillway -- 57 m
Head Regulators -- 2No's
Main Canals -- LMC, RMC
Present Status of Works : Modernisation work is under progress
Land Aquisistion : Nil
Budget and Expenditure
Budget for 2011-12 : Rs. 25.00 Lakhs
Expenditure : (up to 6/ 2011) : Rs. Nil
Program for 2011-2012 : Modernisation work is under progress

Index Map