Neeru Chettu Estimate Details for Restoration of tanks

S.No District Mandal Village Name of Work Admin Sanction Desiliting Tank Bund Strengthing Concrete Quantity for Sluice/Weir Shutters
No. of Works
(Nos)
Amount
(Rs in lakhs)
Qty
(Lakh Cum)
Amount
(Rs in lakhs)
Qty
(Lakh Cum)
Amt
(Rs in lakhs)
Qty
(Cum)
Amt
(Rs in lakhs)
Qty
(Nos)
Amt
(Rs in lakhs)
1 KADAPA T.SUNDUPALLE MADITHADU Restoration of Tirunadayya kunta near Berupalli(v) near H/o Madithadu(v) 1 9.98 0.0 0.0 0.0 0.0 174.35 7.73 0.0 0.0
2 KADAPA T.SUNDUPALLE MADITHADU Restoration of thimmi kunta near Komati palli (V) 1 9.98 0.0 0.0 0.0 0.0 195.35 7.84 0.0 0.0
3 KADAPA T.SUNDUPALLE MADITHADU Desilting of feeder channel from Basiddu Bavi vanka to Krishna Reddy cheruvu near Uppara palli (v) 1 4.9 0.1092 4.37 0.0 0.0 0.0 0.0 0.0 0.0
4 KADAPA T.SUNDUPALLE MADITHADU Desilting of feeder channel from Vadde vandla palli vanka to Krishna Reddy cheruvu near Uppara palli (v) 1 9.98 0.2345 9.4 0.0 0.0 0.0 0.0 0.0 0.0
5 KADAPA T.SUNDUPALLE MADITHADU Desilting of Feeder Channel from Adavi vanka to Redla Cheruvu near Vaddepalli(v) H/o Madithadu(v) 1 7.99 0.1877 7.52 0.0 0.0 0.0 0.0 0.0 0.0
6 KADAPA T.SUNDUPALLE MADITHADU Desilting of Krishnareddy Cheruvu near Upparapalli(v) H/o Madithadu(v) 1 9.98 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
7 KADAPA T.SUNDUPALLE MADITHADU Restoration of Godugu rayi kunta near Uppara palli(v) 1 9.21 0.0 0.0 0.0 0.0 205.9 8.35 0.0 0.0
Total